Transaction
1. My deposit receipt from the client.
Production
1. Dec.13:Compressor test images.
2. Dec.14:The crew is preparing for testing.
3. Dec.21:Compressor packaging in progress.
Transaction Country:Afghanistan Product:Air-cooled chiller 1. T/T 30% to be paid as deposit. read more
1.17th August.2020-UK-Fog Cannon+Fogging Machine-Received customer’s back receipt. 2.Next we will update the production 3.14th September.2020-Products have been tested before leaving the factory, and have been packaged and shipped. Transation-Second Order Country:The United Kingdom Customer Number:101078414839 Product Name: 30m Fog Cannon+10kw generator set 1.24th June 2021, We received the second order from the customer. Production 2.10th July 2021 The cannon body and base of the fog cannon have been made, and the fan... read more
Transaction 1. T/T50% as deposit,TT50% balance should be paid before shipment from factory. read more
1.Woodworking dust collector has been finished. 2.The goods have been packed and shipped on time,the following is a detailed picture. 3.The order tracking number is attached to the goods for easy finding and smooth delivery. read more
Transaction Country: Malaysia Product Name: Tunnel Ventilation fan 1.Receive full payment from customer. read more
Transaction Country:Bahrain Products Name:Roots Blower 1.On August 17, a customer in Bahrain ordered two 100# Roots blowers from our company. We received payment from the customer and arranged production. Production 2.The Roots blower ordered by a customer in Bahrain is in production ... read more
Transaction 1. T/T 30% to be paid as deposit. Production 1. Ingredients arrive at factory. 2. Unit assembly. 3. Unit test. Transportion 1. Shipment. read more
1.1st July. 2020062601-USA-Electrostatic sprayer(red)-Customer Pay by Credit card 2.Tested before leaving the factory and ready for transportation to USA. 3.Transportation info read more
Transaction Country:Vietnam Product:mining fan 1. T/T 30% to be paid as deposit. Production 1. The factory has completed the cutting of the fan blades. 2. The fan has been molded. 3. Motor arrival at the factory, processing assembly stage. read more