Transaction
1. My deposit receipt from the client.
Production
1. Dec.13:Compressor test images.
2. Dec.14:The crew is preparing for testing.
3. Dec.21:Compressor packaging in progress.
Transaction Country:Guatemala Product:Fan Blower for Biomass Steam Boiler 1.Customer’s 100% payment bill before production, full trust. Production 1. Have been finished cutting raw material. 2. The two blowers have been finished shot blasting, the housing has completed the welding process. 3. Two... read more
Transaction Country:Thailand Product Name:Centrifugal Fan Blower FY9-26-16D 1. 24th May.2021 Received customer’s deposit bank slip. Production 2.The production department has placed orders. Transportation test word read more
Transaction Country: Vietnam Product Name: Multistage Centrifugal Fan 1.Customer’sdeposit payment bill before production. Production 1.The housing is been fabricated. 2. The oil box is been processing. 3.The main shaf is been procision work. 4. Impeller dynamic balance test one by one... read more
Transaction 1. Customer’s payment bill before production. Production 1. Provide customers with drawings and produce according to the drawings. 2. The Centrifugal fan are in production. 3. The housing and motor of the fan have been assembled by our workers. 4.... read more
1.12th May.2020-Mexico-Fogging Mchine-Receive the customer’s bank receipt. 2.Next, we will update the packing and delivery of the goods. read more
Transaction 1. T/T 30%. 2. The balance payment has been made, and we are waiting for shipment. Production 1. Drilling in progress for the cooling coils. 2. Pressure testing underway for the cooling coils. 3. Plate material has arrived at the factory. 4. The filter and The cooling has arrived at the factory. 5. The fan has arrived at the factory. 6. Assembly of air handling units. 7. Assembly of air handling units and Sealing of panels.... read more
Transaction 1. Customer’s deposit payment bill before production. Production 1. Testing unit operation. Production 2. Ready to ship. Production 3. In shipping warehouse. read more
Transaction 1. T/T 50% as deposit,T/T 50% balance should be paid before shipment from factory. Production 1. The production of the fan has been completed and is being painted. read more
Transaction 1. T/T 30% to be paid as deposit. Production 1. Ingredients arrive at factory. 2. Unit assembly. 3. Unit test. Transportion 1. Shipment. read more
Transaction 1.Customer’s payment bill before production, full trust. Production 1. Have been finished cutting raw material. 2. Two blowers have all been painted in gray as customers requirement. 3. Professional Testing in the laboratory before delivery. Transportion... read more