03
Aug
Transaction
Country:Thailand
Product:centrifugal fan
1.Customer is payment bill before production.
Production
1. The cutting of the fan has been completed.
2. The molding of the fan has been completed.
3. The external procurement of the fan motor has been... read more
29
Feb
1.11th Feb.2020–Received the payment–Peru–Fog Cannon.
2.Production Completed.
3.Shipping and Package Disinfection.
read more
13
Apr
Transaction
Country:U.K.
Product:Explosion proof exhaust fan
1. Customer pays for the goods.
Production
1. The production of explosion-proof fans is completed and testing is underway.
2. Packed and ready to ship.
read more
02
Jun
Transaction
Country:Qatar
Product Name:Misting system
1.27th May.2021 Received customer’s bank slip.
Production
2.The host part has been completed. Will continue to update accessories. Can be shipped after passing the test.
3.Products have been tested before leaving the factory, and have... read more
15
Nov
Transaction
T/T 50%.
2. T/T Balance 50%.
Production
1.Assembly of the Outdoor Unit and Assembly of Connection Unit.
.
2.Installation of pressure gauge.
3.Outdoor nameplate installation completed.
4.Indoor nameplate installation completed and DX Air Handling Unit is Being Prepared... read more
09
Jan
Transaction
1. My deposit receipt from the client.
Production
1. Explosion-proof dust collector testing.
2. Explosion-proof dust collector accessories packaging completed.
3. The dust collector has been tested and is now complete.
Transportion
1. The explosion-proof... read more
30
Dec
Transaction
Country: Thailand
Product Name: ID FAN for Wooding Working Boiler
1.Customer’sdeposit payment bill before production.
Production
1.Have started cutting raw material. Automatic NC cutting.
2.The fan base has been welded by technicians with many years of welder experience.
3.Housing is been welding.
4.Impeller dynamic test been finished.And qualified.
5.The shedding... read more
03
Apr
Transaction
Country:Maldives
Product:Sound Attenuator
1. Customer’s payment bill before production.
2. Customer’s payment bill after production.
Production
1. Provide customers with drawings and produce according to the drawings.
2. The Sound Attenuator are in production.
3. The Sound Attenuator... read more
20
Apr
Transaction
1. T/T 50% as deposit,T/T 50% balance should be paid before shipment from factory.
Production
1. The production of the fan has been completed and is being painted.
read more
17
Oct
Contraction
Country Name: Indonesia
Product Name: Centrifugal Fan and Other Accessories
read more