14
Jul
Transaction
Country:Vietnam
Product:mining fan
1. T/T 30% to be paid as deposit.
Production
1. The factory has completed the cutting of the fan blades.
2. The fan has been molded.
3. Motor arrival at the factory, processing assembly stage.
read more
07
Sep
1.Product is finished.
2.Product is being transported.
https://www.scy-fan.com/wp-content/uploads/sites/69/2019/09/发货视频.mp4
read more
25
Apr
Transaction
Country:Austria
Product:10m Fog cannon
1.T/T 50%.+50%.
2. Customer pays the final payment.
Production
1. Production of fog cannon poles.
2. Fog pile head.
3. Fog cannon host.
Transportation
1.Production is complete, packed and ready for shipping.... read more
03
Aug
Transaction
Country:Thailand
Product:centrifugal fan
1.Customer is payment bill before production.
Production
1. The factory has completed the cutting of the fan.
2. The factory has completed the welding of the fan.
3. The factory has completed the shaping of the... read more
09
Jun
Transaction
Country:Vietnam
Product:centrifugal fan and impeller
1. Customer’s payment bill before production.
Production
1. Customer’s drawing before production.
2. Have started cutting raw material. Automatic NC cutting.
3. The fan base has been welded by technicians with many years of... read more
03
Apr
Transaction
Country:Maldives
Product:Sound Attenuator
1. Customer’s payment bill before production.
2. Customer’s payment bill after production.
Production
1. Provide customers with drawings and produce according to the drawings.
2. The Sound Attenuator are in production.
3. The Sound Attenuator... read more
15
May
1.30th Apr.2020-Australia-Mist Cannon-Receive the customer’s bank receipt.
2.The product is completed by production.
read more
06
Jun
1.27th May.2020-South Africa-ULV Fogging Machine-Received customer’s back receipt.
2.Next we will update the production of the goods.
read more
02
Aug
Transaction
Country:Turkmenistan
Product:Dust collector
1.Customer’s payment bill before production.
Production
1. The factory has completed the cutting of the dust collector.
2. The workers have started preparing for assembly.
3. The factory has completed the first phase of assembly. ... read more
26
Mar
Transaction
1. Received customer’s bank slip.
Production
1. Production progress update .
2. Hopper production has been completed.
2. Waiting to install air bag and pulse valve .
read more