Transaction
1. T/T50% as deposit,TT50% balance should be paid before shipment from factory.
Transaction Country:Turkmenistan Product:Dust collector 1.Customer’s payment bill before production. Production 1. The factory has completed the cutting of the dust collector. 2. The workers have started preparing for assembly. 3. The factory has completed the first phase of assembly. ... read more
1.Product is under production. 2.Product is finished. Receive customer feedback,very pleasant feeling. The perfect combination of fog cannon and Tesla. Customer praise is our greatest motivation. read more
Transaction 1.Customer’sdeposit payment bill before production. Production 1.Fans for Pakistani customers have been produced and tested on site. 2. Fans for Pakistani customers have been produced and tested on site. Transportion 1. And the goods have been... read more
The product is in production and is about to be completed. read more
1.Woodworker dust collector has been installed and completed. 2.Fan Blower has also been completed and tested. 3.Contact the freight forwarder and prepare to ship. 4.The woodworking dust collector has been shipped. Below are pictures of packing and shipping. read more
1.5th Jun.2020-South Africa-Fogging Machine-Received customer’s back receipt. 2.Products have been tested before leaving the factory, and have been packaged and shipped. read more
The Air cooled chiller used in the Afghan pharmaceutical factory has been tested online with customers on March 30, 2021, and is currently ready to be shipped to customers. read more
Transaction Transaction Country: Moldova Product Name: Membrane 1. December 7th.2021 Received customer’s bank slip. Production Completed and ready to ship. read more
1、8.27 Received Payment voucher from Arab customers read more
Transaction 1. (USD13700.00)as deposit (Paid). Production 1. The production is completed. 2. The production has been tested. 3. Video inspection with customer. read more