Transaction
1. Customer’sdeposit payment bill before production.
Production
1. The housing has been ready for rust removal and then will assembled with the pipes.
2. More pictures sharing.
Transaction 1. Receipt from client for full payment. Production 1. Nov. 27:The compressor has arrived at the factory and is being installed. 2. Nov. 30: Two air-cooled chillers were produced and are under pressure. 3. Dec.07:Test image... read more
1.13th May.2020-Ireland-Mist Cannon-Receive the customer’s bank receipt. 2.Next, we will update the packing and delivery of the goods. read more
Constraction CountryName: Indonesia Products Name: Cutting Blower 50% Deposit payments in advance from customer read more
1.Received payment from Cambodian customer— Roots Blower. 2.The production department is in the process of making roots blower. 3.The roots blower has been finished. Casing: Silencer: 4.Cambodian customer Roots fan already packed. The following is the packaging details. 5.The goods have been delivered to the port designated by the customer—YiWu. read more
Transaction Country: Mongolia Product Name: centrifugal fan KDW315L2-4-3 1.Receive payment slips from customers. Production 1.Centrifugal fan production completed. 2.Centrifugal fans are tested for air flow, air pressure, etc. read more
Transaction Country:Maldives Product:Sound Attenuator 1. Customer’s payment bill before production. 2. Customer’s payment bill after production. Production 1. Provide customers with drawings and produce according to the drawings. 2. The Sound Attenuator are in production. 3. The Sound Attenuator... read more
Transaction Customer’s payment bill before production. 2. Customer’s payment bill after production. Production 1. Provide customers with drawings and produce according to the drawings. 2.The Centrifugal fan are in production. 3.The Centrifugal fan are assembled by our workers. 4.Centrifugal fan pictures to... read more
Transaction 1. Customer payment in full. Production 1. The Coil production is completed. 2. The dimensions are being measured according to the drawing. read more
Transaction 1. My deposit receipt from the client. Production 1. Dec.13:Compressor test images. 2. Dec.14:The crew is preparing for testing. 3. Dec.21:Compressor packaging in progress. read more
Transaction Country:Vietnam Product:mining fan 1. T/T 30% to be paid as deposit. Production 1. The factory has completed the cutting of the fan blades. 2. The fan has been molded. 3. Motor arrival at the factory, processing assembly stage. read more