Order Tracking No.:SCY20220429-Indonesia-Cutting Blower
Constraction CountryName: Indonesia Products Name: Cutting Blower 50% Deposit payments in advance from customer read more
Order Tracking No.:SCY20220307-Hongkong, China-Centrifugal fan 10-18-8C
Transaction Country: Hongkong Product Name: centrifugal fan 10-18-8C 1.Customer’s payment bill before production. Production 1.Provide customers with drawings and produce according to the drawings. 2.Housing, impeller in the production process. 3.The housing and motor of the fan have been... read more
Order Tracking No.:SCY20211119-Thailand-ID FAN for Wooding Working Boiler
Transaction Country: Thailand Product Name: ID FAN for Wooding Working Boiler 1.Customer’sdeposit payment bill before production. Production 1.Have started cutting raw material. Automatic NC cutting. 2.The fan base has been welded by technicians with many years of welder experience. 3.Housing is been welding. 4.Impeller dynamic test been finished.And qualified. 5.The shedding... read more
Tracking Order:SCY2021524-India-Cooling Fan
Transaction Country:India Customer Number:SCY2021524 Product Amount:7990USD Product Name:Cooling Fan 1.19th July.2021 Received customer’s bank slip Production 2.After confirming drawing, start production for ten sets fans. Have finished cutting material process. 3.Housing and frame of the ten fans has been finished. ... read more
Order Tracking No.:SCY100746230628-Indonesia-Centrifugal fan Heat exchanger Filter bag Filter bag cage Rotary valve Pulse valve Pulse valve controller
Country:Indonesia Product: Centrifugal fan Heat exchanger Filter bag Filter bag cage Rotary valve Pulse valve Pulse valve controller 1.17th Dec.2020 Received customer’s bank slip 2.Production progress update:Centrifugal fan 3.Production progress update:Heat exchanger 4.Production progress update:Filter bag cage 5.Production progress update:Filter bag 6.Production progress update:Rotary valve 7.Production progress update:Pulse valve 8.Production progress update:Pulse valve controller 9.2019-04-14: Cargo is ready and waiting for... read more
Order Tracking No.:202006250002-Uganda-Fogging Machine
1.15th July.2020-Uganda-Fogging Machine-Received customer’s back receipt. 2.The product has been tested before leaving the factory and is ready for transportation to Kenya. read more
Order Tracking No.:SCY20211029-Guatemala-Fan Blower for Biomass Steam Boiler
Transaction Country:Guatemala Product:Fan Blower for Biomass Steam Boiler 1.Customer’s 100% payment bill before production, full trust. Production 1. Have been finished cutting raw material. 2. The two blowers have been finished shot blasting, the housing has completed the welding process. 3. Two... read more
Order Tracking No.:SCY20200827-Mexico-Impeller-Second Order
Transaction Country:Mexico Product Name:Impeller Customer’s payment bill before production. Production 1.Impeller and shaft in production. 2.The impeller is still in production and the shaft has been produced. 3.The blades are spot welded to the hub. ... read more
Order Tracking No.:2020050502-South Africa-Fogging Machine
1.13th May.2020-South Africa-Fogging Machine-Receive the customer’s bank receipt. 2.14th May.2020-Production completed. 3.26th May.2020-Ship by sea. read more