Related Posts
Order Tracking No.:SCY20220714-United Arab Emirates (UAE)-Centrifugal Blower
Transaction Country:United Arab Emirates (UAE) Product:Centrifugal Blower 1.50% Deposit payments in advance from customer. Production 1. The casing, impeller, and bracket parts have been finished lofting,marking-off and cutting. 2. The impeller and casing of the centrifugal fan have been assembled and... read more
Order Tracking No.:AR2022081903-Mexico-Fog cannon
Transaction country: Mexico Product: Fog cannon read more
Order Tracking No.:Decent 2020080301-Australia -ULV and Mist eliminator
Australia -ULV and Mist eliminator 1 1.7th August.2020-Australia-Fogging Machine and ulv-Received customer’s back receipt. 2 2.Products have been tested before leaving the factory, and have been packaged and shipped by air on August 25 read more
Order Tracking No.:SCY101097567100-Kenya-Dust collector
Country:Kenya Product:Dust collector 25th Feb.2021 Received customer’s bank slip. Production progress update Hopper production has been completed Impeller of fan blower production has been completed The production of the fan blower outlet silencer has been completed The dust collector box has been spliced Waiting to install air bag and pulse valve read more
Order Tracking No.:MIC20200507-Mexico-Fogging Mchine
1.12th May.2020-Mexico-Fogging Mchine-Receive the customer’s bank receipt. 2.Next, we will update the packing and delivery of the goods. read more
Order Tracking No.:MIC20200430-South Africa-Fogging Machine
1.12th May.2020-South Africa-Fogging Machine-Receive the customer’s bank receipt. 2.Next, we will update the packing and delivery of the goods. read more
Tracking Order:SCY20230322-India-Cooling Fan
Transaction 1. Received customer’s bank slip Production 1.After confirming drawing, start production for ten sets fans. Have finished cutting material process. 2. This is the goods ten sets of cooling fans after shot blasting. 3. Painting the top... read more
Orde Tracking No.:MIC20200423-Ireland-Mist Cannon
1.13th May.2020-Ireland-Mist Cannon-Receive the customer’s bank receipt. 2.Next, we will update the packing and delivery of the goods. read more
Order Tracking No.: MIC20230227-Vietnam-mining fan
Transaction Country:Vietnam Product:mining fan 1. T/T 30% to be paid as deposit. Production 1. The factory has completed the cutting of the fan blades. 2. The fan has been molded. 3. Motor arrival at the factory, processing assembly stage. read more