Transaction
1. Received 50% deposit from customer.
Production
1. The material cutting is complete.
2. The housing assembly is complete.
3. The fan painting is complete.
Transaction Country:Turkmenistan Product:Dust collector 1.Customer’s payment bill before production. Production 1. The factory has completed the cutting of the dust collector. 2. The workers have started preparing for assembly. 3. The factory has completed the first phase of assembly. ... read more
Transaction 1. 50% Deposit payments in advance from the customer. Production 1. CNC cutting and blanking, more precise. Production 2. Fan has been finished as customer’s requirement, the motor on the top is the installation limited. read more
1.21th Oct.2019-Receive a deposit-Chad-Low flatbed semi trailer 2.31th Jan.2020-Receipt of payment-Chad-Low flatbed semi trailer 3.Stock up 4.Measure 5.Loading read more
1.13th May.2020-South Africa-Fogging Machine-Receive the customer’s bank receipt. 2.14th May.2020-Production completed. 3.26th May.2020-Ship by sea. read more
1.22th May.2020-Chile-Fogging Machine-After receiving the payment voucher, the customer pays the renminbi in China through a Chinese friend. 2.26th May.2020-Chile-Fogging Machine-One sample is sent by UPS express first. read more
Country:HongKong Product:Blower for glue room Drawing 1.31th Dec.2020 Received customer’s purchase order. 2.Production progress update:Impeller 3.Production progress update: Impeller balance testing 4.Production progress update: Ready to ship Transaction-Second Order Country:HongKong Product:Explosion Portable Fan CTF-300 2.As we have stock, the goods are been tested again before delivery. read more
1.30th Mar.2020-Bank receipt-Full payment 2.24th Apr.2020-Dust Collector-Bhutan-The products are packed and lead sealed and shipped. read more
Transaction T/T(USD7963.00) as deposit (Paid). Production 1. The production is completed and awaiting assembly. 2. The exhaust Fan and Centrifugal Fan are assembly completed. 3. The exhaust Fan and Centrifugal Fan has been tested. Transportion 1. The explosion-proof... read more
Transaction 1. Customer’sdeposit payment bill before production. Production 1. Already produced, loading containers. Production 2. Ready to ship. read more
Transaction Country: Singapore Product Name: Air Duct for Tunnel 1.Customer’s deposit payment bill before production. Production 1.The goods has been finished and ready to ship. Ready to ship to singapore this tommorrow. read more