


Order date: 2020.11.03 Country: Slovenia Product name: Fluororubber Diaphragm 1.We received the payment from the Slovenian customer 2.The goods have been sorted out and ready for transportation read more
1.13th May. 2020-El Salvador-Double Drum Bag Dust Collector and Negative Pressure Fan-Receive the customer’s bank receipt. 2.Next, we will update the packing and delivery of the goods. read more
Transaction Country: Serbia Product Name: Heat Exchanger 1.Customer’sdeposit payment bill before production. Customer’sdeposit payment bill before production. Production 1. The housing has been ready for rust removal and then will assembled with the pipes. 2.Now the heat exchangers has already assembled. ... read more
Transaction Product Name: Welding fume collector Country: United States 1. customer’s deposit payment bill before production. Production 1. The production of the welding fume dust collector has been completed. 2. It has been strictly tested before leaving the factory 3. The... read more
Country:Malaysia Product:Fog Cannon-DMC-40 1.11th May.2021 Received customer’s bank slip 2.The production department has placed orders. 3.Cannon base and cannon bodyo had finished welding and painting treatment. 4.Production progress update every 3-5 days. 4. Test and product details. 5.Production progress update every 3-5 days. 6.The product has been packaged and sent to Qingdao Port. 7.The... read more
1.Received the full amount of Roots blower from Bangladesh customer. 2.Ready to arrange production department production. 3.Bangladesh customer’s roots blower has been finished the production.The following is a detailed picture. 4.The goods have been packed and sent to the port.The following is a detailed picture. read more
1.20th October.2020-Tunisia-FogCannon-Received customer’s back receipt. 2.Products have been tested before leaving the factory, and have been packaged and shipped. 3. 13th January.2021-Tunisia-Fog Cannon-Received customer’s balance. read more
Transaction Country: Indonesia Product Name: Centrifugal Fan 1. November 10th.2021 Received customer’s bank slip. Production 1.Have been finished assembly. And the shaft and bearing are customerised for our customer. 2.A trial running. 3.Formal lab test before delivery. read more