Related Posts
Order Tracking No.:Ru2023112501-Mongolia-Air handling unit
Transaction 1. T/T 30%. 2. The balance payment has been made, and we are waiting for shipment. Production 1. Drilling in progress for the cooling coils. 2. Pressure testing underway for the cooling coils. 3. Plate material has arrived at the factory. 4. The filter and The cooling has arrived at the factory. 5. The fan has arrived at the factory. 6. Assembly of air handling units. 7. Assembly of air handling units and Sealing of panels.... read more
Order Tracking No.:20200523001-Nigeria-Mist Cannon;Fogging Machine;ULV;Electrostatic Sprayer; Gasoline High Pressure Sterilization Sprayer
1.23th May.2020-Nigeria-Mist Cannon;Fogging Machine;ULV;Electrostatic Sprayer; Gasoline High Pressure Sterilization Sprayer-Customers pay RMB deposits in China through Chinese friends. 2.29th May.2020-The customer pays the final renminbi in China through a Chinese friend. read more
Order Tracking No.:SCY20211029-Guatemala-Fan Blower for Biomass Steam Boiler
Transaction Country:Guatemala Product:Fan Blower for Biomass Steam Boiler 1.Customer’s 100% payment bill before production, full trust. Production 1. Have been finished cutting raw material. 2. The two blowers have been finished shot blasting, the housing has completed the welding process. 3. Two... read more
Order Tracking No.:Ar2022091001-Turkey-Fog cannon
Transaction Country: Turkey Product name: Fog cannon 1. Receive customer deposit 2. Production read more
Order Tracking No.:MIC20200507-Mexico-Fogging Mchine
1.12th May.2020-Mexico-Fogging Mchine-Receive the customer’s bank receipt. 2.Next, we will update the packing and delivery of the goods. read more
order-tracking-no-scy2022030101-maldives-sound-attenuator
Transaction Country:Maldives Product:Sound Attenuator 1. Customer’s payment bill before production. 2. Customer’s payment bill after production. Production 1. Provide customers with drawings and produce according to the drawings. 2. The Sound Attenuator are in production. 3. The Sound Attenuator... read more
Order Tracking No.:Ar20221002-Austria-10m Fog cannon
Transaction Country:Austria Product:10m Fog cannon 1.T/T 50%.+50%. 2. Customer pays the final payment. Production 1. Production of fog cannon poles. 2. Fog pile head. 3. Fog cannon host. Transportation 1.Production is complete, packed and ready for shipping.... read more
Order Tracking No.: MIC20220718-Mongolia-Axial Fan
Transaction Country:Mongolia Product:Axial Fan 1. 50% Deposit payments in advance from customer. Production 1. The fan casing has been completely welded. 2. The purchased Siemens Bader motor has arrived at the factory. 3. The factory has completed the welding work.... read more
Order Tracking No.:DECENT20190719-2-Slovenia-Fluororubber Diaphragm
Order date: 2020.11.03 Country: Slovenia Product name: Fluororubber Diaphragm 1.We received the payment from the Slovenian customer 2.The goods have been sorted out and ready for transportation read more
Order Tracking No.:SCY20220218-Hongkong, China-Portable Fan&Duct
Transaction Country: Hongkong, China Product Name: Portable Fan&Duct 1.The customer has ordered the portable fan and duct together. Has made the payment. read more