Related Posts
Order Tracking No.:100952675617-Roots Blower
1.Production is finished. 2.Production is transported. read more
Order Tracking No.:SCY2023010901-1-Vietnam-centrifugal fan
Transaction Country:Vietnam Product:centrifugal fan 1.Customer’s payment bill before production. Production 1. Provide customers with drawings and produce according to the drawings. 2. Impeller in the production process. 3.Housing during production. 4. Base during production. 5.The housing and motor... read more
Order Tracking No.:SCY20211211-Serbia-Heat Exchanger
Transaction Country: Serbia Product Name: Heat Exchanger 1.Customer’sdeposit payment bill before production. Customer’sdeposit payment bill before production. Production 1. The housing has been ready for rust removal and then will assembled with the pipes. 2.Now the heat exchangers has already assembled. ... read more
Order Tracking No.:20230314-Chile-Explosion-proof dust collector
Transaction 1. My deposit receipt from the client. Production 1. Explosion-proof dust collector testing. 2. Explosion-proof dust collector accessories packaging completed. 3. The dust collector has been tested and is now complete. Transportion 1. The explosion-proof... read more
Order Tracking No.:vn1267102029wetb–Woodworking Dust Collector
1.Woodworker dust collector has been installed and completed. 2.Fan Blower has also been completed and tested. 3.Contact the freight forwarder and prepare to ship. 4.The woodworking dust collector has been shipped. Below are pictures of packing and shipping. read more
Order Tracking No.:SCY20220100702-U.K-Sound AttenuatorExplosion proof exhaust fan
Transaction Country:U.K. Product:Explosion proof exhaust fan 1. Customer pays for the goods. Production 1. The production of explosion-proof fans is completed and testing is underway. 2. Packed and ready to ship. read more
Order Tracking No.:SCY20220902-Indonesia-Dust collector
Transaction Country: Indonesia Product: dust collector 1.50% Deposit payments in advance from the customer. Production 1.Housing has been finished robert welding. 2.Paiting has been done. And ready to test and ship. read more
Order Tracking No.:SCY20170720-HongKong-Blower for glue room Drawing
Country:HongKong Product:Blower for glue room Drawing 1.31th Dec.2020 Received customer’s purchase order. 2.Production progress update:Impeller 3.Production progress update: Impeller balance testing 4.Production progress update: Ready to ship Transaction-Second Order Country:HongKong Product:Explosion Portable Fan CTF-300 2.As we have stock, the goods are been tested again before delivery. read more
Order Tracking No.: SCY2023031702-Thailand-centrifugal fan
Transaction Country:United Arab Emirates (UAE) Product:centrifugal fan 1.50% Deposit payments in advance from customer. Production 1. The cutting process has been completed, and we are preparing for the welding. 2. The factory has completed the assembly of the fan.he impeller has... read more