Transaction
1. T/T 50% as deposit,T/T 50% balance should be paid before shipment from factory.
Production
1. The production of the fan has been completed and is being painted.
Transaction Country:Italy Produce Name:Fog Cannon 1.10th June.2021-Italy-Fog Cannon-Received customer’s back receipt. Production 2.The workshop is waiting to arrange production 3.Products have been tested before leaving the factory, and will be ready to pack and ship. Transportation 4.The goods has been sailed.Expected to arrive in Genoa on... read more
Transaction 1. 30% Deposit payments in advance from the customer. Production 1. The fan casing has been completely welded. 2. The fan casing has been completely welded. read more
Transaction 1. My deposit receipt from the client. Production 1. Explosion-proof dust collector testing. 2. Explosion-proof dust collector accessories packaging completed. 3. The dust collector has been tested and is now complete. Transportion 1. The explosion-proof... read more
10-Feb.-2020,we received the Guatemalan Customer water bill of centrifugal fan. Packaging and delivery of Guatemalan fans read more
1.16th Apr.2020-Thailand-Mist Cannon-We received the Purchase Order from this customer. 2.26th Apr.2020-The goods are packed and shipped. After the customer received the product, he placed a new order. 1.21th May.2020-Thailand-Mist Cannon-We received the Purchase Order from this customer. 2.26th May.2020-Thailand-Mist Cannon-Receive the customer’s bank receipt. read more
Transaction 1. Customer payment in full. Production 1. The Copper pipe production is completed. 2. The Copper pipe are counted and weighed online. Transportion 1. Customer payment in full. read more
Transaction Country: Mongolia Product Name: centrifugal fan KDW315L2-4-3 1.Receive payment slips from customers. Production 1.Centrifugal fan production completed. 2.Centrifugal fans are tested for air flow, air pressure, etc. read more
Transaction T/T 50%. 2. T/T Balance 50%. Production 1.Assembly of the Outdoor Unit and Assembly of Connection Unit. . 2.Installation of pressure gauge. 3.Outdoor nameplate installation completed. 4.Indoor nameplate installation completed and DX Air Handling Unit is Being Prepared... read more
Transaction 1. My deposit receipt from the client. Production 1. Dec.13:Compressor test images. 2. Dec.14:The crew is preparing for testing. 3. Dec.21:Compressor packaging in progress. read more