1.12th May.2020-Mexico-Fogging Mchine-Receive the customer’s bank receipt.
2.Next, we will update the packing and delivery of the goods.
1.12th May.2020-Mexico-Fogging Mchine-Receive the customer’s bank receipt.
2.Next, we will update the packing and delivery of the goods.
Transaction 1. Receipt from client for full payment. Production 1. Nov. 27:The compressor has arrived at the factory and is being installed. 2. Nov. 30: Two air-cooled chillers were produced and are under pressure. 3. Dec.07:Test image... read more
Transaction 1. My deposit receipt from the client. Production 2. Packing and weighing artificial plants. read more
Transaction 1. (USD13700.00)as deposit (Paid). Production 1. The production is completed. 2. The production has been tested. 3. Video inspection with customer. read more
Transaction Customer’s payment bill before production. 2. Customer’s payment bill after production. Production 1. Provide customers with drawings and produce according to the drawings. 2.The Centrifugal fan are in production. 3.The Centrifugal fan are assembled by our workers. 4.Centrifugal fan pictures to... read more
Transaction Country:Thailand Product:centrifugal fan 1.Customer is payment bill before production. Production 1. The factory has completed the cutting of the fan. 2. The factory has completed the welding of the fan. 3. The factory has completed the shaping of the... read more
Transaction Country: Thailand Product Name: ID FAN for Wooding Working Boiler 1.Customer’sdeposit payment bill before production. Production 1.Have started cutting raw material. Automatic NC cutting. 2.The fan base has been welded by technicians with many years of welder experience. 3.Housing is been welding. 4.Impeller dynamic test been finished.And qualified. 5.The shedding... read more
Transaction Country:Kazakhstan Product:Axial Fan 1. T/T 50% to be paid as deposit. 2. The customer pays the remaining 50% of the payment. Production 1. Production completed. 2. Measuring dimension. 3.Testing unit air volume. Transportation 1. Ready to... read more
Transaction 1. Customer’sdeposit payment bill before production. Production 1. Already produced, loading containers. Production 2. Ready to ship. read more
1.23th May.2020-Nigeria-Mist Cannon;Fogging Machine;ULV;Electrostatic Sprayer; Gasoline High Pressure Sterilization Sprayer-Customers pay RMB deposits in China through Chinese friends. 2.29th May.2020-The customer pays the final renminbi in China through a Chinese friend. read more
Country:Indonesia Tracking number:2021041701 1.This is the AHU used in the plastic processing plant in Indonesia. We discussed for more than three months and reached an agreement 2.16th,July 2021. AHU-Received customer’s back receipt. 3.At present, the customized AHU unit is being assembled. It is expected to take about 2-3 days. After the assembly is completed, we will conduct a test and issue a test report. read more