1.Product is finished.
2.Product is transported.
1.Product is finished.
2.Product is transported.
Transaction Country:Guatemala Product:Fan Blower for Biomass Steam Boiler 1.Customer’s 100% payment bill before production, full trust. Production 1. Have been finished cutting raw material. 2. The two blowers have been finished shot blasting, the housing has completed the welding process. 3. Two... read more
Transaction Country Name:Mongolia Product Name:Centrifugal fan 1.Customer’s payment bill before production. Production 1.Provide customers with drawings and produce according to the drawings. 2.The Centrifugal fanare in production 3.The Centrifugal fan are assembled by our workers. 4.Centrifugal fan pictures to customers. read more
1.The product is finished. 2.The original ship scheduled for October 13 will be postponed to the 19th. Bill of lading number:I240248347S04 Vessel voyage:TIHAMA 011W read more
1.17th August.2020-UK-Fog Cannon+Fogging Machine-Received customer’s back receipt. 2.Next we will update the production 3.14th September.2020-Products have been tested before leaving the factory, and have been packaged and shipped. Transation-Second Order Country:The United Kingdom Customer Number:101078414839 Product Name: 30m Fog Cannon+10kw generator set 1.24th June 2021, We received the second order from the customer. Production 2.10th July 2021 The cannon body and base of the fog cannon have been made, and the fan... read more
Transaction Country:Bolivia Product:DX AHU 1. Customer’s payment bill before production. read more
Transaction 1. Deposit payments in advance from the customer. Production 1. Goods in Stock will be sent by express. read more
Transaction Country: Pakistan Product Name: centrifugal fan 9-19-8D Production 1.Customer’sCAD drawing before production. 2.Have started cutting raw material. Automatic NC cutting. 3.The fan base has been welded by technicians with many years of welder experience. 4. The housingand motor... read more
Transaction 1. 50% Deposit payments in advance from the customer. Production 1. CNC cutting and blanking, more precise. Production 2. Fan has been finished as customer’s requirement, the motor on the top is the installation limited. read more
1.The product—Fog Cannon has finished. 2.Shipment:Scheduled for the 23rd of November, the ship is 10-12 days. read more