1.The product—Fog Cannon has finished.
2.Shipment:Scheduled for the 23rd of November, the ship is 10-12 days.
1.The product—Fog Cannon has finished.
2.Shipment:Scheduled for the 23rd of November, the ship is 10-12 days.
Transaction Country: Indonesia Product Name: Centrifugal Fan 1. November 10th.2021 Received customer’s bank slip. Production 1.Have been finished assembly. And the shaft and bearing are customerised for our customer. 2.A trial running. 3.Formal lab test before delivery. read more
Country:Thailand Product:Roots blower Date:2020-09-16 Received customer’s bank receipt. read more
Transaction Country:Maldives Product:Sound Attenuator 1. Customer’s payment bill before production. 2. Customer’s payment bill after production. Production 1. Provide customers with drawings and produce according to the drawings. 2. The Sound Attenuator are in production. 3. The Sound Attenuator... read more
Transaction Country:Indonesia Products Name: Cutting Blower-22Kw 1.We have received the PO from the customer and have notified the production department to prepare a production plan to start production Production 2.The fan blower has been produced, and the dynamic balance test has been carried out, and the fan blower operation test has been carried out. 3.The fan has been packaged and ready to... read more
1.13th May. 2020-El Salvador-Double Drum Bag Dust Collector and Negative Pressure Fan-Receive the customer’s bank receipt. 2.Next, we will update the packing and delivery of the goods. read more
Transaction Country:Austria Product:10m Fog cannon 1.T/T 50%.+50%. 2. Customer pays the final payment. Production 1. Production of fog cannon poles. 2. Fog pile head. 3. Fog cannon host. Transportation 1.Production is complete, packed and ready for shipping.... read more
Transaction Country:Indonesia Product:Impeller 1. Receive 100 percent payments from customer. read more
Country:HongKong Product:Blower for glue room Drawing 1.31th Dec.2020 Received customer’s purchase order. 2.Production progress update:Impeller 3.Production progress update: Impeller balance testing 4.Production progress update: Ready to ship Transaction-Second Order Country:HongKong Product:Explosion Portable Fan CTF-300 2.As we have stock, the goods are been tested again before delivery. read more
Tracking order:SCY2019080203 Country:Indonesia Product:Blower Fan 5-47-4C 1.16th Aprial.2021 Received customer’s bank slip. 2. Customer booking a vessel : Etd 7 Jun 21 Eta 20 Jun 21. 3. Goods has been sent to warehouse. read more
Transaction Country:Thailand Product:Dust collector 1. T/T 50% to be paid as deposit. Production 1. Upper box production. 2. The box is welded. 3. Dust collector box. 4. Mounting brackets. 5. Painting and wiring have been completed. 6.... read more