Transaction
Country:Panama City
Product:Laundry Heat Pump
Country:Panama City
Product:Laundry Heat Pump
Production
Transportation
1.12th May.2020-South Africa-Fogging Machine-Receive the customer’s bank receipt. 2.Next, we will update the packing and delivery of the goods. read more
Transaction Country: Indonesia Product Name: Centrifugal Fan 1. November 10th.2021 Received customer’s bank slip. Production 1.Have been finished assembly. And the shaft and bearing are customerised for our customer. 2.A trial running. 3.Formal lab test before delivery. read more
Transaction Country: Mongolia Product Name: centrifugal fan KDW315L2-4-3 1.Receive payment slips from customers. Production 1.Centrifugal fan production completed. 2.Centrifugal fans are tested for air flow, air pressure, etc. read more
Transaction 1. Customer’s payment bill before production. Production 1. Provide customers with drawings and produce according to the drawings. 2. The Centrifugal fan are in production. 3. The housing and motor of the fan have been assembled by our workers. 4.... read more
1.The product—Fog Cannon has finished. 2.Shipment:Scheduled for the 23rd of November, the ship is 10-12 days. read more
Transaction 1. 50% Deposit payments in advance from customer. Production 1. The housing has been finished by robot welding with the common base. 2. The boiler fan has been sprayed with anti-rust primer. read more
Country:Bilivia Product:High pressure centrifugal fan Parameters: Airflow:12577~30186m3/h Pressure:9229~7822Pa Speed:1450rpm Power:90kw(Siemens-Beide) Temperature:80℃ 1. 28th Oct.2020 Received customer’s back receipt. 2.Production progress update:Laser cutting 3.Production progress update:Nameplate 4.Production progress update:Production details 5.Production progress update:Ready to ship read more
Transaction Country: Australia Product Name: Dust Fan 1.Customer’sdeposit payment bill before production. Production 1. The prototype is produced. 2. The following modifications are made: (1)The wheels are equipped with brakes and the wheel size is increased to ensure smooth operation in poor... read more
Country:Indonesia Tracking number:2021041701 1.This is the AHU used in the plastic processing plant in Indonesia. We discussed for more than three months and reached an agreement 2.16th,July 2021. AHU-Received customer’s back receipt. 3.At present, the customized AHU unit is being assembled. It is expected to take about 2-3 days. After the assembly is completed, we will conduct a test and issue a test report. read more