Transaction
1. 50% Deposit payments in advance from customer.
Production
1. The housing has been finished by robot welding with the common base.
2. The boiler fan has been sprayed with anti-rust primer.
Transaction country: Mexico Product: Fog cannon read more
Country:Kenya Product:Dust collector 25th Feb.2021 Received customer’s bank slip. Production progress update Hopper production has been completed Impeller of fan blower production has been completed The production of the fan blower outlet silencer has been completed The dust collector box has been spliced Waiting to install air bag and pulse valve read more
1.Woodworker dust collector has been installed and completed. 2.Fan Blower has also been completed and tested. 3.Contact the freight forwarder and prepare to ship. 4.The woodworking dust collector has been shipped. Below are pictures of packing and shipping. read more
Transaction T/T(USD7963.00) as deposit (Paid). Production 1. The production is completed and awaiting assembly. 2. The exhaust Fan and Centrifugal Fan are assembly completed. 3. The exhaust Fan and Centrifugal Fan has been tested. Transportion 1. The explosion-proof... read more
Transaction Country:Italy Produce Name:Fog Cannon 1.10th June.2021-Italy-Fog Cannon-Received customer’s back receipt. Production 2.The workshop is waiting to arrange production 3.Products have been tested before leaving the factory, and will be ready to pack and ship. Transportation 4.The goods has been sailed.Expected to arrive in Genoa on... read more
Transaction Country: Hongkong, China Product: Centrifugal Fan 4-72-10 Production 1.Customer’sCAD drawing before production. 2.Have started cutting raw material. Automatic NC cutting. 3.Thefan base has been welded by technicians with many years of welder experience. 4. The housingand motor of the fan have been assembled by our workers. 5.The impeller... read more
Transaction Country:Afghanistan Product:Air-cooled chiller 1. T/T 30% to be paid as deposit. read more
Transaction Country:Mexico Product Name:Impeller Customer’s payment bill before production. Production 1.Impeller and shaft in production. 2.The impeller is still in production and the shaft has been produced. 3.The blades are spot welded to the hub. ... read more
Transaction Country: Indonesia Product: dust collector 1.50% Deposit payments in advance from the customer. Production 1.Housing has been finished robert welding. 2.Paiting has been done. And ready to test and ship. read more
1.26th August.2020-Saudi Arabia-Fog Cannon-Received customer’s back receipt. 2.Next we will update the production 3.Products have been tested before leaving the factory, and have been packaged and shipped. read more