20
Apr
1.16th Apr.2020-Thailand-Mist Cannon-We received the Purchase Order from this customer.
2.26th Apr.2020-The goods are packed and shipped.
After the customer received the product, he placed a new order.
1.21th May.2020-Thailand-Mist Cannon-We received the Purchase Order from this customer.
2.26th May.2020-Thailand-Mist Cannon-Receive the customer’s bank receipt.
read more
19
Sep
Transaction
Country: Australia
Product Name: Dust Fan
1.Customer’sdeposit payment bill before production.
Production
1. The prototype is produced.
2. The following modifications are made:
(1)The wheels are equipped with brakes and the wheel size is increased to ensure smooth operation in poor... read more
03
Apr
Transaction
1. Customer’sdeposit payment bill before production.
Production
1. The housing has been ready for rust removal and then will assembled with the pipes.
2. More pictures sharing.
read more
16
Nov
1.The product—Fog Cannon has finished.
2.Shipment:Scheduled for the 23rd of November, the ship is 10-12 days.
read more
19
Dec
Transaction
1. T/T 30%.
2. The balance payment has been made, and we are waiting for shipment.
Production
1. Drilling in progress for the cooling coils.
2. Pressure testing underway for the cooling coils.
3. Plate material has arrived at the factory.
4. The filter and The cooling has arrived at the factory.
5. The fan has arrived at the factory.
6. Assembly of air handling units.
7. Assembly of air handling units and Sealing of panels.... read more
29
Mar
Transaction
1.Received customer’s back receipt.
Production
1.The workshop is waiting to arrange production.
2.Products have been tested before leaving the factory, and will be ready to pack and ship.
read more
07
Jun
Transaction
Country:Mongolia
Product:Axial Fan
1. 50% Deposit payments in advance from customer.
Production
1. The fan casing has been completely welded.
2. The purchased Siemens Bader motor has arrived at the factory.
3. The factory has completed the welding work.... read more
12
Apr
Transaction
Country:Kazakhstan
Product:Axial Fan
1. T/T 50% to be paid as deposit.
2. The customer pays the remaining 50% of the payment.
Production
1. Production completed.
2. Measuring dimension.
3.Testing unit air volume.
Transportation
1. Ready to... read more
07
Apr
Sorry, this entry is only available in Russian.
read more
08
Apr
Transaction
Country:United Arab Emirates (UAE)
Product:Centrifugal Blower
1.50% Deposit payments in advance from customer.
Production
1. The casing, impeller, and bracket parts have been finished lofting,marking-off and cutting.
2. The impeller and casing of the centrifugal fan have been assembled and... read more