1.21th Oct.2019-Receive a deposit-Chad-Low flatbed semi trailer
2.31th Jan.2020-Receipt of payment-Chad-Low flatbed semi trailer
3.Stock up
4.Measure
5.Loading
1.21th Oct.2019-Receive a deposit-Chad-Low flatbed semi trailer
2.31th Jan.2020-Receipt of payment-Chad-Low flatbed semi trailer
3.Stock up
4.Measure
5.Loading
Transaction 1. Received 100% deposit from customer. Production 1. The material cutting is complete. 2. The housing assembly is complete. 3. The impeller painting is complete. read more
Transaction Country Name:Mongolia Product Name:Centrifugal fan 1.Customer’s payment bill before production. Production 1.Provide customers with drawings and produce according to the drawings. 2.The Centrifugal fanare in production 3.The Centrifugal fan are assembled by our workers. 4.Centrifugal fan pictures to customers. read more
Transaction Country:Thailand Product:centrifugal fan 1.Customer is payment bill before production. Production 1. The cutting of the fan has been completed. 2. The molding of the fan has been completed. 3. The external procurement of the fan motor has been... read more
Transaction Country:Mexico Product Name:Impeller Customer’s payment bill before production. Production 1.Impeller and shaft in production. 2.The impeller is still in production and the shaft has been produced. 3.The blades are spot welded to the hub. ... read more
Transaction 1. The deposit has been received from customer. Production 1. Production of mobile axial flow fan completed. Transportation 1. The fans have been assembled and ready to ship. Transportation 2. Four fans have been packed, labeled, and shipped. read more
2019-04-14:Cargo is ready and waiting for painting. Waiting for the balance payment. read more
Transaction 1. Received 50% deposit from customer. Production 1. Raw material has been cut, and next will be welded. 2. The impeller has been finished,and meet the dynamic balance test. 3. The welding of the fan is complete. 5. The assembly of the fan is complete. 6. The inspection and trial run have been completed. Transportion ... read more
Transaction Country: India Product Name: Fog Cannon-DMC-30 1.18th March.2022 Received customer’s bank slip Production 1.The production department has placed orders. 2.Production progress update every 3-5 days. read more
1.The product—Fog Cannon has finished. 2.Shipment:Scheduled for the 23rd of November, the ship is 10-12 days. read more
Transaction Country:Vietnam Product:mining fan 1. T/T 30% to be paid as deposit. Production 1. The factory has completed the cutting of the fan blades. 2. The fan has been molded. 3. Motor arrival at the factory, processing assembly stage. read more