Order Tracking No.:SCY2022072701-Philippines-Cooling Fan

1. Received 50% deposit from customer.

1. Raw material has been cut, and next will be welded.

2. The impeller has been finished,and meet the dynamic balance test.

3. The welding of the fan is complete.

5. The assembly of the fan is complete.

6. The inspection and trial run have been completed.

1. The inspection and trial run have been completed.

Share this post