09
Apr
Transaction
Country: Hongkong, China
Product Name: Dust collector-MF9015
1.Customer’s payment bill before production.
Production
1.The performance test of the dust collector is completed.
read more
03
Apr
Transaction
Country:Maldives
Product:Sound Attenuator
1. Customer’s payment bill before production.
2. Customer’s payment bill after production.
Production
1. Provide customers with drawings and produce according to the drawings.
2. The Sound Attenuator are in production.
3. The Sound Attenuator... read more
07
Sep
1.Product is finished.
2.Product is being transported.
https://www.scy-fan.com/wp-content/uploads/sites/69/2019/09/发货视频.mp4
read more
02
Sep
Received payment for ULV machine from Arab customer,Getting ready for delivery
read more
06
Mar
Transaction
1. Customer’sdeposit payment bill before production.
Production
1. Already produced, loading containers.
Production
2. Ready to ship.
read more
08
Apr
Transaction
Country:United Arab Emirates (UAE)
Product:Centrifugal Blower
1.50% Deposit payments in advance from customer.
Production
1. The casing, impeller, and bracket parts have been finished lofting,marking-off and cutting.
2. The impeller and casing of the centrifugal fan have been assembled and... read more
02
Aug
Transaction
Country:Turkmenistan
Product:Dust collector
1.Customer’s payment bill before production.
Production
1. The factory has completed the cutting of the dust collector.
2. The workers have started preparing for assembly.
3. The factory has completed the first phase of assembly. ... read more
12
Jul
Transaction
Country:Afghanistan
Product:Air-cooled chiller
1. T/T 30% to be paid as deposit.
read more
12
Apr
Transaction
1. T/T 50% as deposit,T/T 50% payment before shipment from factory.
Production
1. Theproduction is completed.
2. The dimensions are being measured according to the drawing.
read more
10
Oct
1.The product is finished.
2.The original ship scheduled for October 13 will be postponed to the 19th.
Bill of lading number:I240248347S04
Vessel voyage:TIHAMA 011W
read more