Order Tracking No.: Ru2023081501-Tanzania-DX Air Handling Unit

  1. T/T 50%.

2. T/T Balance 50%.

1.Assembly of the Outdoor Unit and Assembly of Connection Unit.

.

2.Installation of pressure gauge.

3.Outdoor nameplate installation completed.

4.Indoor nameplate installation completed and DX Air Handling Unit is Being Prepared for Testing.

.

5.Startup run test.

6. Customer arranges third-party inspection.

1. Preparing for shipment.

2. Container arrived at the factory.

3. Container loading is completed.

Share this post