Transaction
1. T/T 100% to be paid as deposit.
Production
1. Assembly of functional segments.
2. Production completed.
3. The achine of testis completed.
Transportion
1. Packaging completed.
2. The machine has been shipped.
Transaction Country:Vietnam Product:centrifugal fan and impeller 1. Customer’s payment bill before production. Production 1. Customer’s drawing before production. 2. Have started cutting raw material. Automatic NC cutting. 3. The fan base has been welded by technicians with many years of... read more
Transaction 1.Received customer’s back receipt. Production 1.The workshop is waiting to arrange production. 2.Products have been tested before leaving the factory, and will be ready to pack and ship. read more
1.24th Apr.2020-Canada-Electrostatic Sprayer-Receive the customer’s bank receipt. 2.Next, we will update the production of the product. read more
Translation 1. Receive the deposit from the customer’s refrigeration unit. Production 1. Receive the deposit from the customer’s refrigeration unit. 2. Parts of the refrigeration unit are in place and ready to be assembled. 3. The initial trial... read more
Transaction Country:Thailand Product:centrifugal fan 1.Customer is payment bill before production. Production 1. The cutting of the fan has been completed. 2. The molding of the fan has been completed. 3. The external procurement of the fan motor has been... read more
1.22th May.2020-Chile-Fogging Machine-After receiving the payment voucher, the customer pays the renminbi in China through a Chinese friend. 2.26th May.2020-Chile-Fogging Machine-One sample is sent by UPS express first. read more
Transaction Country:Mongolia Product:Sound Attenuator、back draft damper 1. Customer’s payment bill before production. Production 1. Provide customers with drawings of Sound Attenuator. 2. The Sound Attenuator are in production. 3. The Sound Attenuator are assembled by our workers. 4. Back... read more
1.Production is finished. 2.Production is transported. read more
Transaction Country:Maldives Product:Sound Attenuator 1. Customer’s payment bill before production. 2. Customer’s payment bill after production. Production 1. Provide customers with drawings and produce according to the drawings. 2. The Sound Attenuator are in production. 3. The Sound Attenuator... read more
Transaction Country: Hongkong, China Product Name: Portable Fan&Duct 1.The customer has ordered the portable fan and duct together. Has made the payment. read more