Order Tracking No.: SCY2022042403-Mongolia-Sound Attenuator、back draft damper

1. Customer’s  payment bill before production.

1. Provide customers with drawings of Sound Attenuator.

2. The Sound Attenuator are in production.

3. The Sound Attenuator are assembled by our workers.

4. Back Draft Damper is in production.

5. The factory has completed the assembly work of the Back Draft Damper.

6. We have completed the inspection of the Back Draft Damper.

1. The Sound Attenuator are packed and  to be shipped to the port.

2.  Back draft damper has been packed and is  to be shipped to the port.

Share this post