Transaction
1.Received customer’s back receipt.
Production
1.The workshop is waiting to arrange production.
2.Products have been tested before leaving the factory, and will be ready to pack and ship.
Transaction Country:Kyrgyzstan Product:centrifugal fan 1. Customer’s payment bill before production. Production 1. Customer’s drawing before production. 2. The factory has completed the cutting process. 3. The impeller has been welded by technicians with years of welding experience. 4. Four... read more
Tracking order:SCY2019080203 Country:Indonesia Product:Blower Fan 5-47-4C 1.16th Aprial.2021 Received customer’s bank slip. 2. Customer booking a vessel : Etd 7 Jun 21 Eta 20 Jun 21. 3. Goods has been sent to warehouse. read more
Country:Indonesia Product: Centrifugal fan Heat exchanger Filter bag Filter bag cage Rotary valve Pulse valve Pulse valve controller 1.17th Dec.2020 Received customer’s bank slip 2.Production progress update:Centrifugal fan 3.Production progress update:Heat exchanger 4.Production progress update:Filter bag cage 5.Production progress update:Filter bag 6.Production progress update:Rotary valve 7.Production progress update:Pulse valve 8.Production progress update:Pulse valve controller 9.2019-04-14: Cargo is ready and waiting for... read more
Country:Malaysia Product:Fog Cannon-DMC-40 1.11th May.2021 Received customer’s bank slip 2.The production department has placed orders. 3.Cannon base and cannon bodyo had finished welding and painting treatment. 4.Production progress update every 3-5 days. 4. Test and product details. 5.Production progress update every 3-5 days. 6.The product has been packaged and sent to Qingdao Port. 7.The... read more
1.Received the full amount of Roots blower from Bangladesh customer. 2.Ready to arrange production department production. 3.Bangladesh customer’s roots blower has been finished the production.The following is a detailed picture. 4.The goods have been packed and sent to the port.The following is a detailed picture. read more
Transaction 1. Received 50% deposit from customer. Production 1. Raw material has been cut, and next will be welded. 2. The impeller has been finished,and meet the dynamic balance test. 3. The welding of the fan is complete. 5. The assembly of the fan is complete. 6. The inspection and trial run have been completed. Transportion ... read more
Transaction 1. T/T 50% as deposit,T/T 50% balance should be paid before shipment from factory. Production 1. The production of the fan has been completed and is being painted. read more
1.13th May. 2020-El Salvador-Double Drum Bag Dust Collector and Negative Pressure Fan-Receive the customer’s bank receipt. 2.Next, we will update the packing and delivery of the goods. read more
Transaction Country: Serbia Product Name: Heat Exchanger 1.Customer’sdeposit payment bill before production. Customer’sdeposit payment bill before production. Production 1. The housing has been ready for rust removal and then will assembled with the pipes. 2.Now the heat exchangers has already assembled. ... read more