05
Aug
Transaction
Country:India
Customer Number:SCY2021524
Product Amount:7990USD
Product Name:Cooling Fan
1.19th July.2021 Received customer’s bank slip
Production
2.After confirming drawing, start production for ten sets fans. Have finished cutting material process.
3.Housing and frame of the ten fans has been finished.
... read more
10
Oct
1.The product is finished.
read more
07
Sep
1.Product is finished.
2.Product is being transported.
https://www.scy-fan.com/wp-content/uploads/sites/69/2019/09/发货视频.mp4
read more
09
Jun
Transaction
Country:Vietnam
Product:centrifugal fan and impeller
1. Customer’s payment bill before production.
Production
1. Customer’s drawing before production.
2. Have started cutting raw material. Automatic NC cutting.
3. The fan base has been welded by technicians with many years of... read more
29
Jul
1.17th June.2020-Peru-Fog Cannon-Received customer’s back receipt.
2.Products have been tested before leaving the factory, and have been packaged and shipped.
read more
02
Apr
1.21th Oct.2019-Receive a deposit-Chad-Low flatbed semi trailer
2.31th Jan.2020-Receipt of payment-Chad-Low flatbed semi trailer
3.Stock up
4.Measure
5.Loading
read more
10
Jan
Transaction
1. Received 50% deposit from customer.
Production
1. The material cutting is complete.
2. The housing assembly is complete.
3. The fan painting is complete.
read more
20
Nov
Transaction
Customer’s payment bill before production.
2. Customer’s payment bill after production.
Production
1. Provide customers with drawings and produce according to the drawings.
2.The Centrifugal fan are in production.
3.The Centrifugal fan are assembled by our workers.
4.Centrifugal fan pictures to... read more
15
Feb
Transaction
Country: Pakistan
Product Name: centrifugal fan 9-19-8D
Production
1.Customer’sCAD drawing before production.
2.Have started cutting raw material. Automatic NC cutting.
3.The fan base has been welded by technicians with many years of welder experience.
4. The housingand motor... read more
20
Mar
Transaction
1. Received 100% deposit from customer.
Production
1. The material cutting is complete.
2. The housing assembly is complete.
3. The impeller painting is complete.
read more