23
Mar
Transaction
1. Received customer’s bank slip
Production
1.After confirming drawing, start production for ten sets fans. Have finished cutting material process.
2. This is the goods ten sets of cooling fans after shot blasting.
3. Painting the top... read more
09
Apr
Transaction
Country: Hongkong, China
Product Name: Dust collector-MF9015
1.Customer’s payment bill before production.
Production
1.The performance test of the dust collector is completed.
read more
15
Jul
Transaction
Country:United Arab Emirates (UAE)
Product:centrifugal fan
1.50% Deposit payments in advance from customer.
Production
1. The cutting process has been completed, and we are preparing for the welding.
2. The factory has completed the assembly of the fan.he impeller has... read more
17
Jul
Country:Indonesia
Tracking number:2021041701
1.This is the AHU used in the plastic processing plant in Indonesia. We discussed for more than three months and reached an agreement
2.16th,July 2021. AHU-Received customer’s back receipt.
3.At present, the customized AHU unit is being assembled. It is expected to take about 2-3 days. After the assembly is completed, we will conduct a test and issue a test report.
read more
02
Jun
1.21th May.2020-Peru-Mist Cannon-Receive the customer’s bank receipt.
2.The product has finished production.
3.03th Jun.2020-BILL OF LADING
read more
10
Apr
Country:Indonesia
Product:
Centrifugal fan
Heat exchanger
Filter bag
Filter bag cage
Rotary valve
Pulse valve
Pulse valve controller
1.17th Dec.2020 Received customer’s bank slip
2.Production progress update:Centrifugal fan
3.Production progress update:Heat exchanger
4.Production progress update:Filter bag cage
5.Production progress update:Filter bag
6.Production progress update:Rotary valve
7.Production progress update:Pulse valve
8.Production progress update:Pulse valve controller
9.2019-04-14: Cargo is ready and waiting for... read more
16
May
Transaction
Country: Vietnam
Product Name: Multistage Centrifugal Fan
1.Customer’sdeposit payment bill before production.
Production
1.The housing is been fabricated.
2. The oil box is been processing.
3.The main shaf is been procision work.
4. Impeller dynamic balance test one by one... read more
12
Mar
Transaction
1. Customer’s deposit payment slip.
Production
1. Product nozzle completed.
2. Product control cabinet completed.
3. Product nameplate completed.
4. Product is finished.
Transportion
1. Fog cannon packaged and sent to Singapore.
read more
18
Mar
Transaction
1. (USD13700.00)as deposit (Paid).
Production
1. Theproduction is completed.
2. Theproduction has been tested.
read more
31
Aug
1.26th August.2020-Saudi Arabia-Fog Cannon-Received customer’s back receipt.
2.Next we will update the production
3.Products have been tested before leaving the factory, and have been packaged and shipped.
read more