1.21th May.2020-Peru-Mist Cannon-Receive the customer’s bank receipt.

2.The product has finished production.

3.03th Jun.2020-BILL OF LADING

1.21th May.2020-Peru-Mist Cannon-Receive the customer’s bank receipt.
2.The product has finished production.
3.03th Jun.2020-BILL OF LADING
1.20th October.2020-Tunisia-FogCannon-Received customer’s back receipt. 2.Products have been tested before leaving the factory, and have been packaged and shipped. 3. 13th January.2021-Tunisia-Fog Cannon-Received customer’s balance. read more
1.16th June.2021-Algeria-Woodworking Dust Collector-Received customer’s back receipt. 2.The producthas been produced, ready to test electrical appliances such as fans and control cabinets, and ready to ship after passing the test 3.The goods have been produced and packaged, ready to be shipped. And edited the assembly video for the customer, the link... read more
1.5th Jun.2020-South Africa-Fogging Machine-Received customer’s back receipt. 2.Products have been tested before leaving the factory, and have been packaged and shipped. read more
1.The product is finished. 2.The original ship scheduled for October 13 will be postponed to the 19th. Bill of lading number:I240248347S04 Vessel voyage:TIHAMA 011W read more
Transaction Country: Indonesia Product Name: Centrifugal Fan 1. November 10th.2021 Received customer’s bank slip. Production 1.Have been finished assembly. And the shaft and bearing are customerised for our customer. 2.A trial running. 3.Formal lab test before delivery. read more
1.9th July.2020-Guatemala-Fogging Machine-Received customer’s back receipt. 2.Products have been tested before leaving the factory, and have been packaged and shipped.The cargo ship is scheduled to sail on July 25 3.We expect customers to receive the perfect goods and put them into use read more
Transaction Country: USA Product: Fog cannon 1. Receive customer deposit 2. Production read more
Transaction Country Name: Kazakhstan Product Name: Tunnel Mining Ventilation Fan Receive the customer’s full payment bill. read more
1.21th Oct.2019-Receive a deposit-Chad-Low flatbed semi trailer 2.31th Jan.2020-Receipt of payment-Chad-Low flatbed semi trailer 3.Stock up 4.Measure 5.Loading read more
1.The product—Fog Cannon has finished. 2.Shipment:Scheduled for the 23rd of November, the ship is 10-12 days. read more