1.21th May.2020-Peru-Mist Cannon-Receive the customer’s bank receipt.

2.The product has finished production.

3.03th Jun.2020-BILL OF LADING

1.21th May.2020-Peru-Mist Cannon-Receive the customer’s bank receipt.
2.The product has finished production.
3.03th Jun.2020-BILL OF LADING
Transaction Country:Qatar Product Name:Misting system 1.27th May.2021 Received customer’s bank slip. Production 2.The host part has been completed. Will continue to update accessories. Can be shipped after passing the test. 3.Products have been tested before leaving the factory, and have... read more
Date:2020-09-19 1.Semi finished product 2.Completed Product Transaction-Second order Products Name: Tunnel fan and VFD Production read more
1.21th Oct.2019-Receive a deposit-Chad-Low flatbed semi trailer 2.31th Jan.2020-Receipt of payment-Chad-Low flatbed semi trailer 3.Stock up 4.Measure 5.Loading read more
Transaction Country: United Arab Emirates (UAE) Product: Shredding Blower 1.50% Deposit payments in advance from the customer. 2. Housing and serrated mouth have been finished. 3. Base has been welded with housing and assembled with the shaft, and the inlet... read more
Country:Indonesia Product: Centrifugal fan Heat exchanger Filter bag Filter bag cage Rotary valve Pulse valve Pulse valve controller 1.17th Dec.2020 Received customer’s bank slip 2.Production progress update:Centrifugal fan 3.Production progress update:Heat exchanger 4.Production progress update:Filter bag cage 5.Production progress update:Filter bag 6.Production progress update:Rotary valve 7.Production progress update:Pulse valve 8.Production progress update:Pulse valve controller 9.2019-04-14: Cargo is ready and waiting for... read more
Transaction Country:India Customer Number:SCY2021524 Product Amount:7990USD Product Name:Cooling Fan 1.19th July.2021 Received customer’s bank slip Production 2.After confirming drawing, start production for ten sets fans. Have finished cutting material process. 3.Housing and frame of the ten fans has been finished. ... read more
Contraction Country Name: Indonesia Product Name: Centrifugal Fan and Other Accessories read more
1.12th May.2020-Peru-30m Spray Cannon-Receive the customer’s bank receipt. 2.The goods are in production. 3.Horizontal centrifugal pump has been scheduled to arrive, wait for the motor to arrive for installation. 4.28th May.2020-Peru-30m Spray Cannon-The product has finished production 5.The goods are packed and ready to ship read more
Transaction Country:Indonesia Products Name: Cutting Blower-22Kw 1.We have received the PO from the customer and have notified the production department to prepare a production plan to start production Production 2.The fan blower has been produced, and the dynamic balance test has been carried out, and the fan blower operation test has been carried out. 3.The fan has been packaged and ready to... read more
Transaction Country:Indonesia Product:Impeller 1. Receive 100 percent payments from customer. read more