Transaction
1. T/T 50% as deposit,T/T 50% payment before shipment from factory.
Production
1. Theproduction is completed.
2. The dimensions are being measured according to the drawing.
Transaction Country:Israel Product:Air Handling Unit 1. T/T 50% to be paid as deposit. 2. Customer pays 50% of the final payment. Production 1. Assembly of functional segments. 2. Production completed. 3. The installation of the air valve is completed. ... read more
Country:Indonesia Product: Centrifugal fan Heat exchanger Filter bag Filter bag cage Rotary valve Pulse valve Pulse valve controller 1.17th Dec.2020 Received customer’s bank slip 2.Production progress update:Centrifugal fan 3.Production progress update:Heat exchanger 4.Production progress update:Filter bag cage 5.Production progress update:Filter bag 6.Production progress update:Rotary valve 7.Production progress update:Pulse valve 8.Production progress update:Pulse valve controller 9.2019-04-14: Cargo is ready and waiting for... read more
1.Received the full amount of Roots blower from Bangladesh customer. 2.Ready to arrange production department production. 3.Bangladesh customer’s roots blower has been finished the production.The following is a detailed picture. 4.The goods have been packed and sent to the port.The following is a detailed picture. read more
1.16th Apr.2020-Thailand-Mist Cannon-We received the Purchase Order from this customer. 2.26th Apr.2020-The goods are packed and shipped. After the customer received the product, he placed a new order. 1.21th May.2020-Thailand-Mist Cannon-We received the Purchase Order from this customer. 2.26th May.2020-Thailand-Mist Cannon-Receive the customer’s bank receipt. read more
Date:2020-09-19 1.Semi finished product 2.Completed Product Transaction-Second order Products Name: Tunnel fan and VFD Production read more
Country:Indonesia Tracking number:2021041701 1.This is the AHU used in the plastic processing plant in Indonesia. We discussed for more than three months and reached an agreement 2.16th,July 2021. AHU-Received customer’s back receipt. 3.At present, the customized AHU unit is being assembled. It is expected to take about 2-3 days. After the assembly is completed, we will conduct a test and issue a test report. read more
Transaction country: Mexico Product: Fog cannon read more
1.25th Apr.2020-Guatemala-Hand-Held Thermal Fogging Machine-Receive the customer’s bank receipt. 2.The goods have been produced and packed. It has been sent to Qingdao Port. 3.The product has been sent by sea, the date of launch is 2020-05-22, the original bill of lading has been sent. read more
Transaction 1. T/T 30%. 2. The balance payment has been made, and we are waiting for shipment. Production 1. Drilling in progress for the cooling coils. 2. Pressure testing underway for the cooling coils. 3. Plate material has arrived at the factory. 4. The filter and The cooling has arrived at the factory. 5. The fan has arrived at the factory. 6. Assembly of air handling units. 7. Assembly of air handling units and Sealing of panels.... read more