Order Tracking No.:Ru2022111001-Israel-Air Handling Unit

1. T/T 50% to be paid as deposit.

2. Customer pays 50% of the final payment.

1. Assembly of functional segments.

2. Production completed.

3. The installation of the air valve is completed.

4. Measuring unit length.

5. Measuring unit width.

6. Measuring unit height.

7. Testing unit air volume.

8.Ready to ship.

Share this post