1.PVC Flexible Air Duct and Axial Flow Fan has been finished.
2.Air Ducts and Axial Fans have been shipped to the port, and it takes about a week to ship.
1.PVC Flexible Air Duct and Axial Flow Fan has been finished.
2.Air Ducts and Axial Fans have been shipped to the port, and it takes about a week to ship.
Country:Indonesia Tracking number:2021041701 1.This is the AHU used in the plastic processing plant in Indonesia. We discussed for more than three months and reached an agreement 2.16th,July 2021. AHU-Received customer’s back receipt. 3.At present, the customized AHU unit is being assembled. It is expected to take about 2-3 days. After the assembly is completed, we will conduct a test and issue a test report. read more
Transaction Country:Vietnam Product:mining fan 1. T/T 30% to be paid as deposit. Production 1. The factory has completed the cutting of the fan blades. 2. The fan has been molded. 3. Motor arrival at the factory, processing assembly stage. read more
Country:Czech Republic Product:Fog Cannon The fog cannon that our Czech customer just ordered, we have notified the Production Department to start production read more
Transaction country: Mexico Product: Fog cannon read more
1.Product is under production. 2.Product is finished. Receive customer feedback,very pleasant feeling. The perfect combination of fog cannon and Tesla. Customer praise is our greatest motivation. read more
Transaction Country:Guatemala Product:Fan Blower for Biomass Steam Boiler 1.Customer’s 100% payment bill before production, full trust. Production 1. Have been finished cutting raw material. 2. The two blowers have been finished shot blasting, the housing has completed the welding process. 3. Two... read more
1.23th May.2020-Nigeria-Mist Cannon;Fogging Machine;ULV;Electrostatic Sprayer; Gasoline High Pressure Sterilization Sprayer-Customers pay RMB deposits in China through Chinese friends. 2.29th May.2020-The customer pays the final renminbi in China through a Chinese friend. read more
Transaction 1. Received 100% deposit from customer. Production 1. The material cutting is complete. 2. The housing assembly is complete. 3. The impeller painting is complete. read more
1.Receive payment slips from customers. read more