Transaction
1. 30% Deposit payments in advance from the customer.
Production
1. The fan casing has been completely welded.
2. The fan casing has been completely welded.
1.Product is finished. 2.Product is being transported. https://www.scy-fan.com/wp-content/uploads/sites/69/2019/09/发货视频.mp4 read more
Transaction Country:Austria Product:10m Fog cannon 1.T/T 50%.+50%. 2. Customer pays the final payment. Production 1. Production of fog cannon poles. 2. Fog pile head. 3. Fog cannon host. Transportation 1.Production is complete, packed and ready for shipping.... read more
Transaction Country: Serbia Product Name: Heat Exchanger 1.Customer’sdeposit payment bill before production. Customer’sdeposit payment bill before production. Production 1. The housing has been ready for rust removal and then will assembled with the pipes. 2.Now the heat exchangers has already assembled. ... read more
1、8.27 Received Payment voucher from Arab customers read more
Transaction Country:India Customer Number:SCY2021524 Product Amount:7990USD Product Name:Cooling Fan 1.19th July.2021 Received customer’s bank slip Production 2.After confirming drawing, start production for ten sets fans. Have finished cutting material process. 3.Housing and frame of the ten fans has been finished. ... read more
1.16th Apr.2020-Thailand-Mist Cannon-We received the Purchase Order from this customer. 2.26th Apr.2020-The goods are packed and shipped. After the customer received the product, he placed a new order. 1.21th May.2020-Thailand-Mist Cannon-We received the Purchase Order from this customer. 2.26th May.2020-Thailand-Mist Cannon-Receive the customer’s bank receipt. read more
Transaction Country:Kyrgyzstan Product:centrifugal fan 1. Customer’s payment bill before production. Production 1. Customer’s drawing before production. 2. The factory has completed the cutting process. 3. The impeller has been welded by technicians with years of welding experience. 4. Four... read more
1.17th June.2020-Peru-Fog Cannon-Received customer’s back receipt. 2.Products have been tested before leaving the factory, and have been packaged and shipped. read more
Transaction 1. T/T 30%. 2. The balance payment has been made, and we are waiting for shipment. Production 1. Drilling in progress for the cooling coils. 2. Pressure testing underway for the cooling coils. 3. Plate material has arrived at the factory. 4. The filter and The cooling has arrived at the factory. 5. The fan has arrived at the factory. 6. Assembly of air handling units. 7. Assembly of air handling units and Sealing of panels.... read more
Transaction Customer’s payment bill before production. 2. Customer’s payment bill after production. Production 1. Provide customers with drawings and produce according to the drawings. 2.The Centrifugal fan are in production. 3.The Centrifugal fan are assembled by our workers. 4.Centrifugal fan pictures to... read more