1.17th June.2020-Peru-Fog Cannon-Received customer’s back receipt.
2.Products have been tested before leaving the factory, and have been packaged and shipped.
1.17th June.2020-Peru-Fog Cannon-Received customer’s back receipt.
2.Products have been tested before leaving the factory, and have been packaged and shipped.
Transaction 1. Customer’s deposit payment bill before production. Production 1. Testing unit operation. Production 2. Ready to ship. Production 3. In shipping warehouse. read more
2019-04-14: The dust collector is ready for delivery. read more
Transaction Country Name: Egypt Product Name: Centrifugal Blower 1.100% Deposit payments in advance from the customer. read more
1.11th Feb.2020–Received the payment–Peru–Fog Cannon. 2.Production Completed. 3.Shipping and Package Disinfection. read more
Transaction Country:Indonesia Product:Impeller 1. Receive 100 percent payments from customer. read more
Date:2020-09-19 1.Semi finished product 2.Completed Product Transaction-Second order Products Name: Tunnel fan and VFD Production read more
Contraction Country Name: Indonesia Product Name: Centrifugal Fan and Other Accessories read more
1.The product is finished. 2.The original ship scheduled for October 13 will be postponed to the 19th. Bill of lading number:I240248347S04 Vessel voyage:TIHAMA 011W read more
Transaction Country:United Arab Emirates (UAE) Product:centrifugal fan 1.50% Deposit payments in advance from customer. Production 1. The cutting process has been completed, and we are preparing for the welding. 2. The factory has completed the assembly of the fan.he impeller has... read more
1.24th Apr.2020-Canada-Electrostatic Sprayer-Receive the customer’s bank receipt. 2.Next, we will update the production of the product. read more