02
Sep
Received payment for ULV machine from Arab customer,Getting ready for delivery
read more
30
Nov
1.Received a deposit from a Filipino customer— Refrigeration Unit.
2.Parts of the refrigeration unit are in place and ready to be assembled.
3.The refrigeration unit has finished. We will test refrigeration unit on next Monday, and shoot the test video.
4.Refrigeration unit has completed the first... read more
17
Oct
Contraction
Country Name: Indonesia
Product Name: Centrifugal Fan and Other Accessories
read more
17
Sep
Transaction
Country: United Arab Emirates (UAE)
Product: Shredding Blower
1.50% Deposit payments in advance from the customer.
2. Housing and serrated mouth have been finished.
3. Base has been welded with housing and assembled with the shaft, and the inlet... read more
18
Oct
Constraction
CountryName: Indonesia
Products Name: Cutting Blower
50% Deposit payments in advance from customer
read more
30
Dec
Transaction
Country: Thailand
Product Name: ID FAN for Wooding Working Boiler
1.Customer’sdeposit payment bill before production.
Production
1.Have started cutting raw material. Automatic NC cutting.
2.The fan base has been welded by technicians with many years of welder experience.
3.Housing is been welding.
4.Impeller dynamic test been finished.And qualified.
5.The shedding... read more
20
Mar
Transaction
1. Received 100% deposit from customer.
Production
1. The material cutting is complete.
2. The housing assembly is complete.
3. The impeller painting is complete.
read more
16
Nov
1.The product—Fog Cannon has finished.
2.Shipment:Scheduled for the 23rd of November, the ship is 10-12 days.
read more
13
Dec
Transaction
1. Received 50% deposit from customer.
Production
1. Raw material has been cut, and next will be welded.
2. The impeller has been finished,and meet the dynamic balance test.
3. The welding of the fan is complete.
5. The assembly of the fan is complete.
6. The inspection and trial run have been completed.
Transportion ... read more
15
Apr
1.30th Mar.2020-Bank receipt-Full payment
2.24th Apr.2020-Dust Collector-Bhutan-The products are packed and lead sealed and shipped.
read more