18
Oct
Constraction
CountryName: Indonesia
Products Name: Cutting Blower
50% Deposit payments in advance from customer
read more
06
Jun
1.5th Jun.2020-South Africa-Fogging Machine-Received customer’s back receipt.
2.Products have been tested before leaving the factory, and have been packaged and shipped.
read more
17
Aug
Product is under production.
read more
17
Jul
Country:Indonesia
Tracking number:2021041701
1.This is the AHU used in the plastic processing plant in Indonesia. We discussed for more than three months and reached an agreement
2.16th,July 2021. AHU-Received customer’s back receipt.
3.At present, the customized AHU unit is being assembled. It is expected to take about 2-3 days. After the assembly is completed, we will conduct a test and issue a test report.
read more
12
Apr
Transaction
1. T/T 50% as deposit,T/T 50% payment before shipment from factory.
Production
1. Theproduction is completed.
2. The dimensions are being measured according to the drawing.
read more
09
Jan
Transaction
1. My deposit receipt from the client.
Production
2. Packing and weighing artificial plants.
read more
02
Apr
1.21th Oct.2019-Receive a deposit-Chad-Low flatbed semi trailer
2.31th Jan.2020-Receipt of payment-Chad-Low flatbed semi trailer
3.Stock up
4.Measure
5.Loading
read more
13
May
1.13th May. 2020-El Salvador-Double Drum Bag Dust Collector and Negative Pressure Fan-Receive the customer’s bank receipt.
2.Next, we will update the packing and delivery of the goods.
read more
08
Apr
Transaction
Country:United Arab Emirates (UAE)
Product:Centrifugal Blower
1.50% Deposit payments in advance from customer.
Production
1. The casing, impeller, and bracket parts have been finished lofting,marking-off and cutting.
2. The impeller and casing of the centrifugal fan have been assembled and... read more
20
Dec
1.PVC Flexible Air Duct and Axial Flow Fan has been finished.
2.Air Ducts and Axial Fans have been shipped to the port, and it takes about a week to ship.
read more