1. T/T 30% to be paid as deposit.
Production
1. Ingredients arrive at factory.
2. Unit assembly.
3. Unit test.
Transportion
1. Shipment.
read more
14
Apr
2019-04-14:Cargo is ready and waiting for painting. Waiting for the balance payment.
read more
11
Apr
Transaction
Country:Panama City
Product:Pool Heat Pump
1. Received PO.
2. Customer pays the final payment.
Production
1. Assembly of One-Phase Power Compressor Unit.
2. Assembly of Heat Exchanger.
3. Assembly of Heat Pumps in Production.
4. Almost Finished... read more
15
Apr
1.30th Mar.2020-Bank receipt-Full payment
2.24th Apr.2020-Dust Collector-Bhutan-The products are packed and lead sealed and shipped.
read more
24
Sep
Transaction
Country:Indonesia
Products Name: Cutting Blower-22Kw
1.We have received the PO from the customer and have notified the production department to prepare a production plan to start production
Production
2.The fan blower has been produced, and the dynamic balance test has been carried out, and the fan blower operation test has been carried out.
3.The fan has been packaged and ready to... read more
30
Jun
Transaction
Country:Thailand
Product:Vacuum Pump
1. 50% Deposit payments in advance from customer.
Production
1. The factory molds the goods into shape.
2. Factory completed polishing and painting.
3. The factory has completed the inspection of the fan.
Transportation ... read more
07
Jun
Transaction
Country:Mongolia
Product:Sound Attenuator、back draft damper
1. Customer’s payment bill before production.
Production
1. Provide customers with drawings of Sound Attenuator.
2. The Sound Attenuator are in production.
3. The Sound Attenuator are assembled by our workers.
4. Back... read more
01
Apr
Transaction
1. FogCannon-Received customer’s back receipt.
2. Fog Cannon-Received customer’s balance.
Production
1. Products have been tested before leaving the factory, and have been packaged and shipped.
read more
21
Mar
Transaction
1.Customer’sdeposit payment bill before production.
Production
1.Fans for Pakistani customers have been produced and tested on site.
2. Fans for Pakistani customers have been produced and tested on site.