1.PVC Flexible Air Duct and Axial Flow Fan has been finished.
2.Air Ducts and Axial Fans have been shipped to the port, and it takes about a week to ship.
1.PVC Flexible Air Duct and Axial Flow Fan has been finished.
2.Air Ducts and Axial Fans have been shipped to the port, and it takes about a week to ship.
1.Fans for Pakistani customers have been produced and tested on site. Wooden boxes are packed for export at the factory, and the goods have been sent to the port for shipment to Pakistan. read more
Transaction Country: Malaysia Product Name: Tunnel Ventilation fan 1.Receive full payment from customer. read more
1.9th July.2020-Guatemala-Fogging Machine-Received customer’s back receipt. 2.Products have been tested before leaving the factory, and have been packaged and shipped.The cargo ship is scheduled to sail on July 25 3.We expect customers to receive the perfect goods and put them into use read more
Transaction Product Name: Welding fume collector Country: United States 1. customer’s deposit payment bill before production. Production 1. The production of the welding fume dust collector has been completed. 2. It has been strictly tested before leaving the factory 3. The... read more
Transaction country: Iran Product: proof mining fan read more
Transaction 1. T/T50% as deposit,TT50% balance should be paid before shipment from factory. read more
Transaction 1. My deposit receipt from the client. Production 1. Explosion-proof dust collector testing. 2. Explosion-proof dust collector accessories packaging completed. 3. The dust collector has been tested and is now complete. Transportion 1. The explosion-proof... read more
Transaction T/T 50%. 2. T/T Balance 50%. Production 1.Assembly of the Outdoor Unit and Assembly of Connection Unit. . 2.Installation of pressure gauge. 3.Outdoor nameplate installation completed. 4.Indoor nameplate installation completed and DX Air Handling Unit is Being Prepared... read more
Transaction Country: Serbia Product Name: Heat Exchanger 1.Customer’sdeposit payment bill before production. Customer’sdeposit payment bill before production. Production 1. The housing has been ready for rust removal and then will assembled with the pipes. 2.Now the heat exchangers has already assembled. ... read more