Transaction
Country:Thailand
Product Name:Centrifugal Fan Blower FY9-26-16D
1. 24th May.2021 Received customer’s deposit bank slip.
Production
2.The production department has placed orders.
Transportation
test word
Country:Thailand
Product Name:Centrifugal Fan Blower FY9-26-16D
Transaction 1. T/T(USD655.00) as deposit (Paid). Production 1. The centrifugal fan is tested. 2. The Centrifugal fan production is completed. 3. The product is packed and The dimensions of the wooden cases were measured. read more
1.Received a deposit from a Filipino customer— Refrigeration Unit. 2.Parts of the refrigeration unit are in place and ready to be assembled. 3.The refrigeration unit has finished. We will test refrigeration unit on next Monday, and shoot the test video. 4.Refrigeration unit has completed the first... read more
Received the payment–Thailand–Industrial Fan. read more
Date:2020-09-19 1.Semi finished product 2.Completed Product Transaction-Second order Products Name: Tunnel fan and VFD Production read more
Transaction Country: Indonesia Product: dust collector 1.50% Deposit payments in advance from the customer. Production 1.Housing has been finished robert welding. 2.Paiting has been done. And ready to test and ship. read more
Transaction Country:Philippines Product:Centrifugal Blower 1. 50% Deposit payments in advance from customer. 2. To match the on-site piping and save time and labor costs for installation, the customer has placed an additional order for fan accessories. The final payment for the fans and... read more
Transaction Country: Hongkong, China Product: Centrifugal Fan 4-72-10 Production 1.Customer’sCAD drawing before production. 2.Have started cutting raw material. Automatic NC cutting. 3.Thefan base has been welded by technicians with many years of welder experience. 4. The housingand motor of the fan have been assembled by our workers. 5.The impeller... read more
Transaction Tracking Order:SCY2021071903 Country:HongKong Product:Centrifugal fan used in woodworking dust collector 1.13th Aug.2021 Received customer’s bank slip. 2.20th Aug.2021Drawing confirmation 3.25th Aug.2021Production progress update. read more
1.22th May.2020-Chile-Fogging Machine-After receiving the payment voucher, the customer pays the renminbi in China through a Chinese friend. 2.26th May.2020-Chile-Fogging Machine-One sample is sent by UPS express first. read more
Transaction 1. Customer’s deposit payment slip. Production 1. Product nozzle completed. 2. Product control cabinet completed. 3. Product nameplate completed. 4. Product is finished. Transportion 1. Fog cannon packaged and sent to Singapore. read more