06
Jun
1.27th May.2020-South Africa-ULV Fogging Machine-Received customer’s back receipt.
2.Next we will update the production of the goods.
read more
17
Apr
Transaction
1. T/T50% as deposit,TT50% balance should be paid before shipment from factory.
read more
21
May
Transaction
Country: Hongkong, China
Product: Centrifugal Fan 4-72-10
Production
1.Customer’sCAD drawing before production.
2.Have started cutting raw material. Automatic NC cutting.
3.Thefan base has been welded by technicians with many years of welder experience.
4. The housingand motor of the fan have been assembled by our workers.
5.The impeller... read more
16
Sep
Country:Thailand
Product:Roots blower
Date:2020-09-16
Received customer’s bank receipt.
read more
01
Feb
Transaction
1. T/T 30% to be paid as deposit.
Production
1. Ingredients arrive at factory.
2. Unit assembly.
3. Unit test.
Transportion
1. Shipment.
read more
10
Apr
The Air cooled chiller used in the Afghan pharmaceutical factory has been tested online with customers on March 30, 2021, and is currently ready to be shipped to customers.
read more
21
Sep
Transaction
Country: Indonesia
Product: dust collector
1.50% Deposit payments in advance from the customer.
Production
1.Housing has been finished robert welding.
2.Paiting has been done. And ready to test and ship.
read more
19
Apr
Tracking order:SCY2019080203
Country:Indonesia
Product:Blower Fan 5-47-4C
1.16th Aprial.2021
Received customer’s bank slip.
2. Customer booking a vessel : Etd 7 Jun 21 Eta 20 Jun 21.
3. Goods has been sent to warehouse.
read more
15
Jun
Transaction
Country:Italy
Produce Name:Fog Cannon
1.10th June.2021-Italy-Fog Cannon-Received customer’s back receipt.
Production
2.The workshop is waiting to arrange production
3.Products have been tested before leaving the factory, and will be ready to pack and ship.
Transportation
4.The goods has been sailed.Expected to arrive in Genoa on... read more
16
Apr
Transaction
Customer payment in full.
read more