Related Posts
Order Tracking No.: MIC20220718-Mongolia-Axial Fan
Transaction Country:Mongolia Product:Axial Fan 1. 50% Deposit payments in advance from customer. Production 1. The fan casing has been completely welded. 2. The purchased Siemens Bader motor has arrived at the factory. 3. The factory has completed the welding work.... read more
Order Tracking No.:20200519002-Chile-Fogging Machine
1.22th May.2020-Chile-Fogging Machine-After receiving the payment voucher, the customer pays the renminbi in China through a Chinese friend. 2.26th May.2020-Chile-Fogging Machine-One sample is sent by UPS express first. read more
Order Tracking No.:SCY20210524-India-Centrifugal fan(Without motor)
Transaction 1. T/T(USD655.00) as deposit (Paid). Production 1. The centrifugal fan is tested. 2. The Centrifugal fan production is completed. 3. The product is packed and The dimensions of the wooden cases were measured. read more
Order Tracking No.:SCY20221215-Moldova-Heat Exchanger
Transaction 1. Customer’sdeposit payment bill before production. Production 1. The housing has been ready for rust removal and then will assembled with the pipes. 2. More pictures sharing. read more
Order Tracking No.:SCY20211220-New Zealand-ID Fan High-Temperature Model
Transaction Country: New Zealand Product name: ID fan high-temperature model Customer’s deposit payment bill before production at January 12th,2022. Production 1.Have started cutting raw material. Automatic NC cutting. 2.Thefan has been finished assembly and anti-rust paint has been sprayed. read more
Order Tracking No.:SCY20231025-Singapore-Movable axial fan
Transaction 1. The deposit has been received from customer. Production 1. Production of mobile axial flow fan completed. Transportation 1. The fans have been assembled and ready to ship. Transportation 2. Four fans have been packed, labeled, and shipped. read more
Order Tracking No.:SCY20240103-Brazil-Refrigeration Unit
Translation 1. Receive the deposit from the customer’s refrigeration unit. Production 1. Receive the deposit from the customer’s refrigeration unit. 2. Parts of the refrigeration unit are in place and ready to be assembled. 3. The initial trial... read more
Order Tracking No.:DECENT20190912-Thailand-Fog Cannon
1.The product—Fog Cannon has finished. 2.Shipment:Scheduled for the 23rd of November, the ship is 10-12 days. read more
Order Tracking No.:El2022091501-Pakistan-Centrifugal Fan Blower
Transaction 1.Customer’sdeposit payment bill before production. Production 1.Fans for Pakistani customers have been produced and tested on site. 2. Fans for Pakistani customers have been produced and tested on site. Transportion 1. And the goods have been... read more