Received payment for ULV machine from Arab customer,Getting ready for delivery
Related Posts
Order Tracking No.:SCY20221215-Moldova-Heat Exchanger
Transaction 1. Customer’sdeposit payment bill before production. Production 1. The housing has been ready for rust removal and then will assembled with the pipes. 2. More pictures sharing. read more
Order Tracking No.:SCY20201123001-Malaysia-Fog Cannon-DMC-40
Country:Malaysia Product:Fog Cannon-DMC-40 1.11th May.2021 Received customer’s bank slip 2.The production department has placed orders. 3.Cannon base and cannon bodyo had finished welding and painting treatment. 4.Production progress update every 3-5 days. 4. Test and product details. 5.Production progress update every 3-5 days. 6.The product has been packaged and sent to Qingdao Port. 7.The... read more
Order Tracking No.:100893612013-PVC Flexible Air Duct and Axial Flow Fan
1.PVC Flexible Air Duct and Axial Flow Fan has been finished. 2.Air Ducts and Axial Fans have been shipped to the port, and it takes about a week to ship. read more
Order Tracking No.:2019031201-
2019-04-13: Cargo delivered already 2019-04-13:standby at the seaport ,waiting for shipping on board read more
Order Tracking No.:QCSV-B1911212CT-Chad-Low Flatbed Semi Trailer
1.21th Oct.2019-Receive a deposit-Chad-Low flatbed semi trailer 2.31th Jan.2020-Receipt of payment-Chad-Low flatbed semi trailer 3.Stock up 4.Measure 5.Loading read more
Order Tracking No.: MIC20230227-Vietnam-mining fan
Transaction Country:Vietnam Product:mining fan 1. T/T 30% to be paid as deposit. Production 1. The factory has completed the cutting of the fan blades. 2. The fan has been molded. 3. Motor arrival at the factory, processing assembly stage. read more
Order Tracking No.:SCY20211029-Guatemala-Fan Blower for Biomass Steam Boiler
Transaction Country:Guatemala Product:Fan Blower for Biomass Steam Boiler 1.Customer’s 100% payment bill before production, full trust. Production 1. Have been finished cutting raw material. 2. The two blowers have been finished shot blasting, the housing has completed the welding process. 3. Two... read more
Order Tracking No.: Ru2022122401-Kazakhstan-Axial Fan
Transaction Country:Kazakhstan Product:Axial Fan 1. T/T 50% to be paid as deposit. 2. The customer pays the remaining 50% of the payment. Production 1. Production completed. 2. Measuring dimension. 3.Testing unit air volume. Transportation 1. Ready to... read more
Order Tracking No.: Ru2022100101-Panama City-Laundry Heat Pump
Transaction Country:Panama City Product:Laundry Heat Pump 1. Received PO. 2. Customer pays the final payment. Production 1. Assembly of Heat Pumps in Production. 2. Heat Pump is Being Prepared for Testing. Transportation 1. Preparing for Transportation. 2.... read more