15
Nov
Transaction
T/T 50%.
2. T/T Balance 50%.
Production
1.Assembly of the Outdoor Unit and Assembly of Connection Unit.
.
2.Installation of pressure gauge.
3.Outdoor nameplate installation completed.
4.Indoor nameplate installation completed and DX Air Handling Unit is Being Prepared... read more
20
Nov
Transaction
Customer’s payment bill before production.
2. Customer’s payment bill after production.
Production
1. Provide customers with drawings and produce according to the drawings.
2.The Centrifugal fan are in production.
3.The Centrifugal fan are assembled by our workers.
4.Centrifugal fan pictures to... read more
17
Sep
Transaction
Country: United Arab Emirates (UAE)
Product: Shredding Blower
1.50% Deposit payments in advance from the customer.
2. Housing and serrated mouth have been finished.
3. Base has been welded with housing and assembled with the shaft, and the inlet... read more
24
Sep
Transaction
Country:Indonesia
Products Name: Cutting Blower-22Kw
1.We have received the PO from the customer and have notified the production department to prepare a production plan to start production
Production
2.The fan blower has been produced, and the dynamic balance test has been carried out, and the fan blower operation test has been carried out.
3.The fan has been packaged and ready to... read more
19
Dec
Transaction
1. T/T 30%.
2. The balance payment has been made, and we are waiting for shipment.
Production
1. Drilling in progress for the cooling coils.
2. Pressure testing underway for the cooling coils.
3. Plate material has arrived at the factory.
4. The filter and The cooling has arrived at the factory.
5. The fan has arrived at the factory.
6. Assembly of air handling units.
7. Assembly of air handling units and Sealing of panels.... read more
09
Oct
Date:25th September 2020
Country:PK
Product:Titanium alloy impeller
1.Received customer’s payment.
2.Next:We will update the production progress of the product
read more
14
May
1.12th May.2020-South Africa-Fogging Machine-Receive the customer’s bank receipt.
2.Next, we will update the packing and delivery of the goods.
read more
16
Mar
Transaction
1. Customer payment in full.
Production
1. The Coil production is completed.
2. The dimensions are being measured according to the drawing.
read more
06
Mar
Transaction
1. Deposit payments in advance from the customer.
Production
1. Goods in Stock will be sent by express.
read more
29
Nov
Transaction
T/T 100% to be paid as deposit.
Production
Assembly of functional segments.
2. Production completed.
3. The machine of testis completed.
Transportation
Packaging completed.
2. The machine has been shipped.
read more