Sorry, this entry is only available in Russian.
Related Posts
16
Mar
Order Tracking No.:Ru2022100901-Afghanistan-Cooling-Water Machine
Transaction 1. (USD13700.00)as deposit (Paid). Production 1. The production is completed. 2. The production has been tested. 3. Video inspection with customer. read more
15
May
Order Tracking No.:101000687047-Australia-Mist Cannon
1.30th Apr.2020-Australia-Mist Cannon-Receive the customer’s bank receipt. 2.The product is completed by production. read more
12
Jul
Order Tracking No.: Ru2022100901-Afghanistan-Air-cooled chiller
Transaction Country:Afghanistan Product:Air-cooled chiller 1. T/T 30% to be paid as deposit. read more
06
Mar
Order Tracking No.:SCY2022043001-Indonesia-Cutting Blower
Transaction 1. 50% Deposit payments in advance from the customer. Production 1. CNC cutting and blanking, more precise. Production 2. Fan has been finished as customer’s requirement, the motor on the top is the installation limited. read more
29
Mar
Order Tracking No.:SCY20220218-Hongkong, China-Portable Fan&Duct
Transaction Country: Hongkong, China Product Name: Portable Fan&Duct 1.The customer has ordered the portable fan and duct together. Has made the payment. read more
15
Feb
Order Tracking No.:SCY20210326-Pakistan-Centrifugal Fan 9-19-8D
Transaction Country: Pakistan Product Name: centrifugal fan 9-19-8D Production 1.Customer’sCAD drawing before production. 2.Have started cutting raw material. Automatic NC cutting. 3.The fan base has been welded by technicians with many years of welder experience. 4. The housingand motor... read more
29
May
Order Tracking No.: SCY20230221-Thailand-Dust collector
Transaction Country:Thailand Product:Dust collector 1. T/T 50% to be paid as deposit. Production 1. Upper box production. 2. The box is welded. 3. Dust collector box. 4. Mounting brackets. 5. Painting and wiring have been completed. 6.... read more
10
Jan
Order Tracking No.:SCY20230902-Singapore-Tunnel Fan
Transaction 1. Received 50% deposit from customer. Production 1. The material cutting is complete. 2. The housing assembly is complete. 3. The fan painting is complete. read more
02
Sep
Order Tracking No.:Decent 20200715-Arab-ULV machine
Received payment for ULV machine from Arab customer,Getting ready for delivery read more