Transaction
1. 50% Deposit payments in advance from customer.
Production
1. The housing has been finished by robot welding with the common base.
2. The boiler fan has been sprayed with anti-rust primer.
Transaction Country: Mongolia Product Name: centrifugal fan KDW315L2-4-3 1.Receive payment slips from customers. Production 1.Centrifugal fan production completed. 2.Centrifugal fans are tested for air flow, air pressure, etc. read more
1.23th May.2020-Nigeria-Mist Cannon;Fogging Machine;ULV;Electrostatic Sprayer; Gasoline High Pressure Sterilization Sprayer-Customers pay RMB deposits in China through Chinese friends. 2.29th May.2020-The customer pays the final renminbi in China through a Chinese friend. read more
Transaction 1. Received customer’s bank slip. Production 1. Production progress update . 2. Hopper production has been completed. 2. Waiting to install air bag and pulse valve . read more
The Air cooled chiller used in the Afghan pharmaceutical factory has been tested online with customers on March 30, 2021, and is currently ready to be shipped to customers. read more
Transaction Country: Singapore Product Name: Air Duct for Tunnel 1.Customer’s deposit payment bill before production. Production 1.The goods has been finished and ready to ship. Ready to ship to singapore this tommorrow. read more
1.The product—Fog Cannon has finished. 2.Shipment:Scheduled for the 23rd of November, the ship is 10-12 days. read more
Transaction 1. T/T(USD655.00) as deposit (Paid). Production 1. The centrifugal fan is tested. 2. The Centrifugal fan production is completed. 3. The product is packed and The dimensions of the wooden cases were measured. read more
Transaction 1. T/T 30% to be paid as deposit. Production 1. Ingredients arrive at factory. 2. Unit assembly. 3. Unit test. Transportion 1. Shipment. read more
Transaction 1. Received customer’s bank slip Production 1.After confirming drawing, start production for ten sets fans. Have finished cutting material process. 2. This is the goods ten sets of cooling fans after shot blasting. 3. Painting the top... read more
Transaction 1. Received 50% deposit from customer. Production 1. The material cutting is complete. 2. The housing assembly is complete. 3. The fan painting is complete. read more