Transaction
1. T/T 100% to be paid as deposit.
Production
1. Assembly of functional segments.
2. Production completed.
3. The achine of testis completed.
Transportion
1. Packaging completed.
2. The machine has been shipped.
Transaction Country: New Zealand Product name: ID fan high-temperature model Customer’s deposit payment bill before production at January 12th,2022. Production 1.Have started cutting raw material. Automatic NC cutting. 2.Thefan has been finished assembly and anti-rust paint has been sprayed. read more
Transaction Country: Mongolia Product Name: centrifugal fan KDW315L2-4-3 1.Receive payment slips from customers. Production 1.Centrifugal fan production completed. 2.Centrifugal fans are tested for air flow, air pressure, etc. read more
Transaction 1. 50% Deposit payments in advance from customer. Production 1. The housing has been finished by robot welding with the common base. 2. The boiler fan has been sprayed with anti-rust primer. read more
Transaction Product Name: Centrifugal Fan and Axial Fan Country: Kazakhstan 1. customer’s deposit payment bill before production. 2. On March 16th, received the final payment slip from the customer. read more
1.27th May.2020-South Africa-ULV Fogging Machine-Received customer’s back receipt. 2.Next we will update the production of the goods. read more
Transaction Customer’s payment bill before production. 2. Customer’s payment bill after production. Production 1. Provide customers with drawings and produce according to the drawings. 2.The Centrifugal fan are in production. 3.The Centrifugal fan are assembled by our workers. 4.Centrifugal fan pictures to... read more
Transaction Country: Singapore Product Name: Air Duct for Tunnel 1.Customer’s deposit payment bill before production. Production 1.The goods has been finished and ready to ship. Ready to ship to singapore this tommorrow. read more
Transaction 1. (USD13700.00)as deposit (Paid). Production 1. The production is completed. 2. The production has been tested. 3. Video inspection with customer. read more
1.9th July.2020-Guatemala-Fogging Machine-Received customer’s back receipt. 2.Products have been tested before leaving the factory, and have been packaged and shipped.The cargo ship is scheduled to sail on July 25 3.We expect customers to receive the perfect goods and put them into use read more
1.Product is finished. 2.Product is being transported. https://www.scy-fan.com/wp-content/uploads/sites/69/2019/09/发货视频.mp4 read more