16
Nov
1.The product—Fog Cannon has finished.
2.Shipment:Scheduled for the 23rd of November, the ship is 10-12 days.
read more
18
Dec
Transaction
Transaction Country: Moldova
Product Name: Membrane
1. December 7th.2021 Received customer’s bank slip.
Production
Completed and ready to ship.
read more
14
Dec
Transaction
1. Receipt from client for full payment.
Production
1. Nov. 27:The compressor has arrived at the factory and is being installed.
2. Nov. 30: Two air-cooled chillers were produced and are under pressure.
3. Dec.07:Test image... read more
30
Nov
1.Received a deposit from a Filipino customer— Refrigeration Unit.
2.Parts of the refrigeration unit are in place and ready to be assembled.
3.The refrigeration unit has finished. We will test refrigeration unit on next Monday, and shoot the test video.
4.Refrigeration unit has completed the first... read more
02
Jun
1.23th May.2020-Nigeria-Mist Cannon;Fogging Machine;ULV;Electrostatic Sprayer;
Gasoline High Pressure Sterilization Sprayer-Customers pay RMB deposits in China
through Chinese friends.
2.29th May.2020-The customer pays the final renminbi in China through a Chinese friend.
read more
28
Sep
1.Product is finished.
2.Product is transported.
read more
23
Mar
Transaction
1. Received customer’s bank slip
Production
1.After confirming drawing, start production for ten sets fans. Have finished cutting material process.
2. This is the goods ten sets of cooling fans after shot blasting.
3. Painting the top... read more
30
Jun
Transaction
Country:Thailand
Product:Vacuum Pump
1. 50% Deposit payments in advance from customer.
Production
1. The factory molds the goods into shape.
2. Factory completed polishing and painting.
3. The factory has completed the inspection of the fan.
Transportation ... read more
29
Mar
Transaction
Country: Hongkong, China
Product Name: Portable Fan&Duct
1.The customer has ordered the portable fan and duct together. Has made the payment.
read more
06
Mar
Transaction
Country:Israel
Product:Air Handling Unit
1. T/T 50% to be paid as deposit.
2. Customer pays 50% of the final payment.
Production
1. Assembly of functional segments.
2. Production completed.
3. The installation of the air valve is completed.
... read more