Transaction
Country:Vietnam
Product:centrifugal fan and impeller
Country:Vietnam
Product:centrifugal fan and impeller
Production
6. The fan production is complete.
Transportation
1. The factory packages and ships the fan.
Transaction 1. T/T 100% to be paid as deposit. Production 1. Assembly of functional segments. 2. Production completed. 3. The achine of testis completed. Transportion 1. Packaging completed. 2. The machine has been shipped. read more
2019-04-14: The dust collector is ready for delivery. read more
Transaction 1. Deposit payments in advance from the customer. Production 1. Goods in Stock will be sent by express. read more
Transaction 1. T/T 30%. 2. The balance payment has been made, and we are waiting for shipment. Production 1. Drilling in progress for the cooling coils. 2. Pressure testing underway for the cooling coils. 3. Plate material has arrived at the factory. 4. The filter and The cooling has arrived at the factory. 5. The fan has arrived at the factory. 6. Assembly of air handling units. 7. Assembly of air handling units and Sealing of panels.... read more
Transaction Country:Maldives Product:Sound Attenuator 1. Customer’s payment bill before production. 2. Customer’s payment bill after production. Production 1. Provide customers with drawings and produce according to the drawings. 2. The Sound Attenuator are in production. 3. The Sound Attenuator... read more
Transaction 1. My deposit receipt from the client. Production 2. Packing and weighing artificial plants. read more
Transaction Customer’s payment bill before production. 2. Customer’s payment bill after production. Production 1. Provide customers with drawings and produce according to the drawings. 2.The Centrifugal fan are in production. 3.The Centrifugal fan are assembled by our workers. 4.Centrifugal fan pictures to... read more
Translation 1. Receive the deposit from the customer’s refrigeration unit. Production 1. Receive the deposit from the customer’s refrigeration unit. 2. Parts of the refrigeration unit are in place and ready to be assembled. 3. The initial trial... read more
1.The product—Fog Cannon has finished. 2.Shipment:Scheduled for the 23rd of November, the ship is 10-12 days. read more