Related Posts
Order Tracking No.:SCY2021071903-Hong Kong-Centrifugal Fan
Transaction Tracking Order:SCY2021071903 Country:HongKong Product:Centrifugal fan used in woodworking dust collector 1.13th Aug.2021 Received customer’s bank slip. 2.20th Aug.2021Drawing confirmation 3.25th Aug.2021Production progress update. read more
Order Tracking No.:SCY20190307-Bilivia-High pressure centrifugal fan
Country:Bilivia Product:High pressure centrifugal fan Parameters: Airflow:12577~30186m3/h Pressure:9229~7822Pa Speed:1450rpm Power:90kw(Siemens-Beide) Temperature:80℃ 1. 28th Oct.2020 Received customer’s back receipt. 2.Production progress update:Laser cutting 3.Production progress update:Nameplate 4.Production progress update:Production details 5.Production progress update:Ready to ship read more
Order Tracking No.:Ar2022091001-Turkey-Fog cannon
Transaction Country: Turkey Product name: Fog cannon 1. Receive customer deposit 2. Production read more
Order Tracking No.:Decent 20200715-Arab-ULV machine
Received payment for ULV machine from Arab customer,Getting ready for delivery read more
Order Tracking No.:SCY2024022302-THAILAND-Combustion Air Fan
Transaction 1. T/T50% as deposit,TT50% balance should be paid before shipment from factory. read more
Order Tracking No.: SCY2023082101-Thailand-Centrifugal fan
Transaction 1. Customer’s payment bill before production. Production 1. Provide customers with drawings and produce according to the drawings. 2. The Centrifugal fan are in production. 3. The housing and motor of the fan have been assembled by our workers. 4.... read more
Order Tracking No.:SCY20210610-Singapore-Air Duct for Tunnel
Transaction Country: Singapore Product Name: Air Duct for Tunnel 1.Customer’s deposit payment bill before production. Production 1.The goods has been finished and ready to ship. Ready to ship to singapore this tommorrow. read more
Order Tracking No.:SCY20200827-Mexico-Impeller-Second Order
Transaction Country:Mexico Product Name:Impeller Customer’s payment bill before production. Production 1.Impeller and shaft in production. 2.The impeller is still in production and the shaft has been produced. 3.The blades are spot welded to the hub. ... read more
Order Tracking No.:Ca2023081201-Panama-Pipe dredging machine
Transaction 1. T/T 100% to be paid as deposit. Production 1. Assembly of functional segments. 2. Production completed. 3. The achine of testis completed. Transportion 1. Packaging completed. 2. The machine has been shipped. read more