Related Posts
Order Tracking No.:SCY20230902-Singapore-Tunnel Fan
Transaction 1. Received 50% deposit from customer. Production 1. The material cutting is complete. 2. The housing assembly is complete. 3. The fan painting is complete. read more
Order Tracking No.:20200519002-Chile-Fogging Machine
1.22th May.2020-Chile-Fogging Machine-After receiving the payment voucher, the customer pays the renminbi in China through a Chinese friend. 2.26th May.2020-Chile-Fogging Machine-One sample is sent by UPS express first. read more
Order Tracking No.: SCY2023082101-Thailand-Centrifugal fan
Transaction 1. Customer’s payment bill before production. Production 1. Provide customers with drawings and produce according to the drawings. 2. The Centrifugal fan are in production. 3. The housing and motor of the fan have been assembled by our workers. 4.... read more
Order Tracking No.:101078414839-UK-Fog Cannon
1.17th August.2020-UK-Fog Cannon+Fogging Machine-Received customer’s back receipt. 2.Next we will update the production 3.14th September.2020-Products have been tested before leaving the factory, and have been packaged and shipped. Transation-Second Order Country:The United Kingdom Customer Number:101078414839 Product Name: 30m Fog Cannon+10kw generator set 1.24th June 2021, We received the second order from the customer. Production 2.10th July 2021 The cannon body and base of the fog cannon have been made, and the fan... read more
Order Tracking No.: Ru2023030801-Cambodia-Fan Coil Unit & Condensate Unit
Transaction Country:Cambodia Product:Fan Coil Unit & Condensate Unit 1. T/T 50% to be paid as deposit. 2.T/T 50% to be paid before shipment from factory. Production 1. In stock, the outdoor unit is being packed. 2. In stock, the indoor... read more
Order Tracking No.:101019621131-Pure-Fog Cannon
1.11th Feb.2020–Received the payment–Peru–Fog Cannon. 2.Production Completed. 3.Shipping and Package Disinfection. read more
Order Tracking No.:SCY20220719-Malaysia-Tunnel Fan impeller
Transaction 1. Received 100% deposit from customer. Production 1. The material cutting is complete. 2. The housing assembly is complete. 3. The impeller painting is complete. read more
Order Tracking No.:Ca2023081201-Panama-Pipe dredging machine
Transaction 1. T/T 100% to be paid as deposit. Production 1. Assembly of functional segments. 2. Production completed. 3. The achine of testis completed. Transportion 1. Packaging completed. 2. The machine has been shipped. read more
Order Tracking No.:Ar2023010702-United States-Welding fume collector
Transaction Product Name: Welding fume collector Country: United States 1. customer’s deposit payment bill before production. Production 1. The production of the welding fume dust collector has been completed. 2. It has been strictly tested before leaving the factory 3. The... read more
Order Tracking No.: SCY20230221-Thailand-Dust collector
Transaction Country:Thailand Product:Dust collector 1. T/T 50% to be paid as deposit. Production 1. Upper box production. 2. The box is welded. 3. Dust collector box. 4. Mounting brackets. 5. Painting and wiring have been completed. 6.... read more